Loading…
Loading…
1,610 live873 closing this weekmost from CPWD and E-IN-C BRANCH - MILITARY ENGINEER SERVICES
1,610 results • Latest
Upgradation to Two lane with paved shoulder of Porbandar Bhanvad Jamjodhpur Kalavad section of NH-151K from Design km 0.000 to Design km 119.500 in the State of Gujarat on HAM.
Design, Manufacture, Supply, Testing & Commissioning of High Output Tamping Cum Stabilizing Machine (HOT&S-3X) along with Training of Indian Railway personnel and 3 years post warranty AMC.
Design, Manufacture, Supply, Testing, and Commissioning of 68 No. of Broad Gauge Cars for Rithala- Narela-Nathupur Corridor (Line-1 Extension) of DMRC including Training of Employers Manpower and CAMC for these 68 No. Broad Gauge Cars.
Design, Manufacture, Supply, Testing & Commissioning of Points & Crossings Changing Machine (PCCM) along with Training of Indian Railway personnel and 3 years post warranty AMC.
EMPANELMENT OF INDIAN SHIP-OWNER / DOMESTIC SHIP-BROKER FOR OFFERING SHIPS FOR TRANSPORTATION OF DRY BULK CARGO.
PROCUREMENT OF 200 MW FIRM & DISPATCHABLE RENEWABLE ENERGY (FDRE) WITH ENERGY STORAGE SYSTEM WITH GREENSHOE OPTION OF CONTRACTING ADDITIONAL 200 MW
AMC of Integrated Security and Surveillance System - CCAMC of 04 high energy cargo container scanners; Comprehensive; Hardware, Software, Wireless System, Networking System, License; Consumables to be provided by Service Provider (included in the con..
Expression of Interest (EOI) from reputed Contractors having Experience in Expressway/ Highway/ Irrigation/ Railway/ Metro/ High Speed Rail/ Power Sector India/ Overseas
Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms).
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode