Loading…
Loading…
Tender Value
Refer Docs
Closing Date
6 Oct 2026, 2:30 pm
Two Packet
Normal Tender
Yes
Total Value Wise
Lowest to Highest
CONSIGNEE
Not Applicable
Expenditure
General
RS/E
1 condition
As specified in Clause 11 of Schedule of Requirements (SOR) and Clause 3.0 of Section-I of Part-II of the attached Bid Document.
14 conditions
Refer check list-I provided in the attached Bid Document
Compliance to the commercial conditions specified in the attached bid document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
3 conditions
Validity of Offer for minimum period of 180 days from the date of Tender Opening - No Deviation is Permitted and offer will be summarily rejected in case of deviation
Submission of Bid Guarantee- No Deviation is Permitted and offer will be summarily rejected in case of deviation
Validity of Bid Guarantee for 225 days from the date of Tender Opening - No Deviation is permitted and offer will be summarily rejected in case of deviation.
2 locations · 432 Man-Days · 5,18,400 Kilometre total
Design, Manufacture, Supply, Testing & Commissioning of Points & Crossings Changing Machine (PCCM) along with Training of Indian Railway personnel and 3 years post warranty AMC.
2026-TM-2
2026-TM-2
Open - Global
(Goods/Service/AMC)
New Delhi, Delhi
₹0
6 Oct 2026
11 Feb 2026
4 items · 432 Man-Days · 5,18,400 Kilometre total
Design, Manufacture, Supply, Testing & Commissioning of Points & Crossings Changing Machine (PCCM) along with Training of Indian Railway personnel. ]
Lump sum cost of the Set of Spares per Machine as defined in Clause 12.0 of the Tech nical Specification of the Machine, required during warranty period of the machine (The Set of Spares offered shall exclude consumables such as oil, lubricants & all types of filters). The spares will be sup plied along with the machine. ]
Servicing and Break down maintenance charges (8 hours per day): including lodging a nd boarding for the service engineer, during post-warranty 3 (three) Years Annual Maintenance Contr act. ]
| Delivery Location | State | Quantity |
|---|---|---|
| ZONAL RAILWAY | — | 432.00 Man-Days |
| Total | 432 Man-Days | |
Conveyance charges for journey on deputation performed by the service engineer, duri ng post warranty 3 (Three) Years Annual Maintenance Contract. The contractor will be paid per Km of actual distance travelled between OEM's Service centre to place of work (to & fro). ]
| Delivery Location | State | Quantity |
|---|---|---|
| ZONAL RAILWAY | — | 518400.00 Kilometre |
| Total | 5,18,400 Kilometre | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Corrigendum_No_4_PCCM.pdf
ATTACHMENT
Corrigendum_No_2_PCCM.pdf
ATTACHMENT
Railway_Board_letter_dated_07.04.22.pdf
ATTACHMENT
Public_Procurement_030817.pdf
ATTACHMENT
Public_Procurement_Orders_Insertion_Rule_144.pdf RB letter dtd 06082020
ATTACHMENT
RSG_EMD_SD_27022024.pdf
ATTACHMENT
RB_PPP_20.08.2024.pdf
ATTACHMENT
RSG_EMDSD_23122019_1.pdf
ATTACHMENT
RevisedIRSConditionsofContract_Sept2022.pdf
ATTACHMENT
Corrigendum_No_1_PCCM.pdf
ATTACHMENT
RB_Letter_144GFR_15032023.pdf
ATTACHMENT
TechnicalSpecification_PCCM_Rev02of2025_1.pdf
ATTACHMENT
Final_BidDocument_PCCM_11022026.pdf
ATTACHMENT
Corrigendum_No_3_PCCM.pdf
ATTACHMENT
Public_Procurement_Orders_Insertion_Rule_144.pdf
ATTACHMENT
Corrigendum_No_4_PCCM.pdf
CORRIGENDUM
Corrigendum_No_3_PCCM.pdf
CORRIGENDUM
Corrigendum_No_2_PCCM.pdf
CORRIGENDUM
Corrigendum_No_1_PCCM.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].