Loading…
Loading…
4,351 results • Latest
Imp/ Dev. of lane by pdg RMC in Gali Kumharan and side lanes Ward 75, Jama Masjid CSPZ.
MOEI & Fans RMO Booster P/Sets, RO, SWHS, AC Appliances refrigerators, DC & WC etc. in the R/o HMPs Bungalows under F/Shah Road Sub Div-I, DED-201. (SH: Fire prevention and pre-monsoon checking)
A/R & M/O Works of Defence Pool Bungalows occupied by Defence Pool Officers under CSD during 2026-27 (SH: Providing Services of Computer Operator & MTS)
Imp/ Dev of lane by pdg RMC in Mehar parvar (M P Street) and side lanes Ward No. 75, Jama Masjid CSPZ.
Imp/ Dev. of lane by pdg RMC in Kutcha Nahar khan and side lanes Ward No. 75, Jama Masjid CSPZ.
Construction of Two Entry Gates in BJ/BG East Block Shalimar Bagh B Ward No. 56, AC-14
FMM FILTER (PH-2) P. NO. 2258290009, MAKE-CHICAGO PNEUMATIC, OIL SEPARATOR (CHICAGO PNEUMATIC) STOCK CODE 2903087100 OF CHICAGO PNEUMATIC, PHASE SEQUENCE RELAY PH-2 P. NO. 909523500 MAKE-CHICAGO PNEUMATIC, Clean oil(500ml pack) stock code of M/s Chicago pneumatic is 9095954669 PACKING SIZE= 500 ML
Construction of New Community Hall at Vijay Nagar in Mukherjee Nagar, Ward No. 13/CLZ
Nortriptyline 10 mg + Pregabalin 75 mg
Annual Repair and Maintenance of Rain Water Harvesting System structures of Offices in Model Town Constituency AC-18 under E.E(C) -18.
Construction of rain water harvesting (RWH) structures under Catch the rain campaign of DJB at different locations in Model Town Constituency AC-18 under E.E(C) -18.
Replacement of old/ damaged 250/300 mm dia sewer line by P/L 300 dia sewer line in H -1 block (1 to 159) ashok vihar phase-I in Wazirpur consituencey AC-17 under EE (C)18
Remodeling of exiting storm water drain with Precast Factory made RCC drain as per New Master Drain Plan 2025 at Maharaja Aggarsen Marg and Muni Maya Ram Marg under Sub Division NW R-14 of NWR-1 Division PWD, Delhi
Replacement of old/damaged Sewer line by P/L 300/400 mm dia DWC SN8 pipe from Valmiki Mandir A-Block to Sanatan Dharam mandir JJ colony , Wazirpur in Ward 66 (Wazirpur) in Wazirpur Constituency AC-17 Under EE( C ) -18.
Construction of Community Hall at Dussehra Ground, Mukherjee Nagar, Ward No.13/CLZ.
Improvement of water Supply Removing of contamination by replacement of 100 mm dia old and rusted water line from H.no.C-6/1 to C-6/21 at Model town in AC-18 Model town Constituency under EE(C )-13.
Replacement and upgradation of old sewerage system by 400 mm dia SN8 DWC HDPE Pipe from C-1 to D-13A/18 in Model town in AC-18 model town under EE(C )13.
Boring and Installation of 1 No. Tubewell at C-Block Rana Pratap Bagh in Model Town Constituency AC-18 Under EE (C)-18
Shifting of sewer network of Dharampura Lodge in Kamla Nagar ward no-69 in Model Town Constituency AC-18 under EE(C)-18
Provision of AC, CCTV, Online UPS, Water Cooler and allied works at Ayurvedic Dispensary Nilothi as Ayushman Aarogya Mandir Nilothi in ward no 36 Narela Zone.
Hiring of 2 Nos. 82 BHP Diesel Engine pump sets for various locations in the wards under Narela zone for monsoon season 2026.
Repairing of submersible pump sets installed at RUB Mundka-I and RUB Mundka-II pump house under Narela Zone.
Hiring of 02 Nos. Drivers and 03 Nos. of Beldars for Municipal vehicles working in EandM division under Narela Zone.
Overhauling kit for wiper motor (RH&LH)
Restoration of existing Rooftop Rainwater Harvesting structures at various Govt. Buildings in Bakhtawarpur, Singhu, Jhangola, Palla, Tajpur under jurisdiction of MCD in Ward Alipur and Bakhtawarpur Ward in AC-01 Narela in EE(C)-09
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at MPL Store Mungeshpur in ward no. 31 Nangal Thakran in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at M and CW Centre Shahbad Daulatpur near MC Primary School in ward no. 29 Pooth khurd in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at PHC Pujabkhor in ward no. 31 Nangal Thakran in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at M and CW Centre Shahbad Daultapur, Near IPP-VIII Health Post in ward no. 29 Pooth khurd in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at JE Store A-Block shahbad Dairy in ward no. 28 Shahbad Dairy in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Ayurvedic Dispensary, Shahbad Daulatpur in ward no. 29 Pooth khurd in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at T.B Centre Shahbad Daulatpur in ward no. 29 Pooth khurd in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Ayurvedic Dispensary begumpur in ward no. 27 in Consituncy AC-07 Bawana under EE (C)-09.
Repair, Maintenance and Restoration of existing Rain water Harvesting Structures and Recharge Pits at various locations in Ward No. 55 56 Shalimar Bagh Constituency AC-14 under EE(C)-37/ SE(C)-7.
Construction of Rooftop Rain water Harvesting Structure at Police Station Shalimar Bagh, Ward No. 55 Shalimar Bagh Constituency AC-14 under EE(C)-37/ SE(C )-7.
Making arrangement for IDC 2026 at Red Fort Delhi on 15/08/2026 (SH: Trenchless conduiting and other misc. civil works for requirement of acoustic coverage as per upcoming plan of bleachers in Madhav Das Park).
Dolutegravir 50mg in pack of 30
Clotrimazole Lotion 15ml
Tab.Glucosamine 750mg
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Mpl.Store, Pooth Khurd in ward no. 29 Pooth khurd in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Dr. Sahib Singh Verma Sports Complex and Recreation Centre, Pooth Khurd in ward no. 29 Pooth khurd in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Unani Dispensary A-Block Shahbad Dairy in ward no. 28 Shahbad Dairy in AC-07 Bawana under EE (C)-09
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Dispensary A-Block Shahbad Dairy in ward no. 28 Shahbad Dairy in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Dispensary A-Block Behind M C Primary School in ward no. 28 Shahbad Dairy in AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Community Centre Sector 24 Rohini in ward no. 27 in Consituncy AC-07 Bawana under EE (C)-09
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Ayurvedic, Homeopathic,Alophetic Dispensary in ward no. 26 in Consituncy AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Senior Citizen Recreation Centre Sector 24 Rohini in ward no. 27 in Consituncy AC-07 Bawana under EE (C)-09.
Construction of Rain water Harvesting Structures for collecting Roof Top rain water at Community Centre, Begumpur village in ward no. 27 in Consituncy AC-07 Bawana under EE (C)-09.
Restoration of existing Rooftop Rainwater Harvesting structures at various installations of DJB in AC-01 Narela, under EE(C)-09.
Construction of new Rooftop rainwater harvesting structures at various installations of DJB in AC-01 Narela in EE(C )-09