Loading…
Loading…
32 results • Recent activity
Widening and Up-gradation of existing carriageway into 2-lane with PS configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode 2nd call
GPS Based Digital Clock Master, GPS Based Digital Clock Slave, LAN cable, Power Cable, Conduit, 5 Amp Switch
Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7025504 Dated : 07-01-2026 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Toner Cartridges/Ink Cartridges/Consumables for Printers Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWERGRID Corporate Office Gurgaon, POWER GRID Corporation OF INDIA Limited, POWER GRID Corporation OF INDIA Limited, Ministry of Power (Powergrid Rhq Kolkata)
Item1 Electronic Weighing scale load capacity of 5000 KG, Item2 Electronic Weighing scale load capacity of 5000 KG, Item3 Electronic Weighing scale load capacity of 5000 KG, Item4 Electronic Weighing scale load capacity of 5000 KG, Item5 Electronic Weighing scale load capacity of 5000 KG, Item6 Electronic Weighing scale load capacity of 5000 KG, Item7 Electronic Weighing scale load capacity of 5000 KG, Item8 Electronic Weighing scale load capacity of 5000 KG, Item9 Electronic Weighing scale load capacity of 5000 KG, Item10 Electronic Weighing scale load capacity of 5000 KG, Item11 Electronic Weighing scale load capacity of 5000 KG, Item12 Electronic Weighing scale load capacity of 5000 KG, Item13 Electronic Weighing scale load capacity of 5000 KG, Item14 Electronic Weighing scale load capacity of 5000 KG, Item15 Electronic Weighing scale load capacity of 5000 KG
Jharsuguda, Deoghar, Patna, Raipur, Ranchi, Bhubaneswar, Gaya, Pakyong, Cooch Behar