Loading…
Loading…
5,066 results • Latest
including MS supports, gate supports, removal of roofing sheet for easy movement of transformer, Transformer DB Supply and fixing of 4way TPN MCB DB with 40A 4P 100mA ELCBplusIsolator as incomer and 3Nos 16A DP MCB, 16A 3P MCB, 16A SP MCB, 10A SP MCB, earthing of DB etc., Supply, fixing, wiring, testing and commisioning of Over voltage relay at the incomer ACB panel of MSB, Re-wiring and connetion of trip circuit in 22kV VCB panel, testing and commisioning, Supply and laying 2mm thick LT electromat for RTCC panelor transformer marshalling box, Supply and fixing of 4P 25A MCB at incomer compartment of MSB including connection using 4Sqmm copper flexible wire, Excavation of soil for taking out the HT cable loop, pulling the cable from trench, backfilling after completion of job etc., Excavation of cable trench for laying cable, providing one layer of bric and sand protection, backfilling etc., Construction of plint for 500kVA Transformer of size 1.2M by 1.2M by 1M L by W by H . Height of plinth form FFL is 30Cm. The work includes excavation, shuttering, CEA formalities including preparation of drawing, submission, arranging inspection, obtaining energisation order. The cost includes all incidental expenses., All statutory feesor payments to KSEBL Paid on actual basis, Precommisioning testing of transformer, installation, testing, commissioning of LandT make 1000 A, 4P ACB 50kA with Microprocessor based release, UV and Shunt trip, Replacement of Analog voltmeter in MCC panel-1 with digital VAFplusPF meter including panel door modification, control wiring connection etc, Replacement of Analog KWorKWHorPf meter in MCC panel-1 and Main lighting panel with digital MFM including panel door modification, Retofitting of 630A TP MCCB in spare feeder for APFC panel including panel door modification, busbar connection, fixing Rotary operating handle mechanism fixing etc, Supply and laying of 1R by 3.5C by 300Sqmm Armoured Al. Ugh cable from newly installed 630A MCCB to APFC panel, Single compression glanding and termination of 3.5C by 300Sqmm armoured Al. cable at APFC and MCC panel side
Acer 21.5” full HD IPS Monitor Model: EK220Q
Facility Management Services - LumpSum Based - Category I - BSNL Telephone Exchanges and Office buildings; Infra Maintenance, Housekeeping; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Category II - BSNL Telephone Exchanges and Office buildings; Housekeeping, Infra Maintenance; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Category III - BSNL Telephone Exchanges and Office buildings; Infra Maintenance; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - CSC/Office assistance; CSC/Office assistance; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Driver/Upkeeping of Departmental vehicle; Driver/Upkeeping of Departmental vehicle; Consumables to be provided by buyer, Facility Management Service - Outcome Based, Facility Management Services - LumpSum Based - Compound/terrance cleaning of departmental buildings; Compound/terrance cleaning of departmental buildings; Consumables to be provided by service provider (inclusive in contract cost)
Annual Plan-Peruvemba GP 209/2025-26 -Pulinnirakkode Road Maintenance
Annual Plan-2025-26 Chalissery GP Pro No( Spill over )155/26 Community Hall - Naveekaranam-General Civil Work
road construction