Loading…
Loading…
895 results • Latest
Balance work of laying rising main PE-80,PN-10 HDPE from Malandihi pump house to Malandihi OHR under Bistupur water supply scheme under RCFA Division-I PHE Dte
Additional work of construction of IEP drain,and platform ,blower room and other allied works at Ijjatgunj under augmentation of Kanksa zone-II C piped water supply scheme under RCFA Division-I PHE Dte.
Additional works for distribution pipeline including interconnection and FHTC at Jhagra village (Purba Para) under RCFA Part-III Zone-I water supply scheme under RCFA Division-I PHE Dte.
Road restoration ,rubbish removal from the dismantaling of distribution pipeline of RCFA Part-II piped water supply scheme including FHTC and allied work under RCFA Division-I PHE Dte. (Zone-7, Segment-3)
Additional work of laying 200 mm and 150 mm dia rising main and jack pushing near Churulia Headwork site and other allied works under Jamuria Block under RCFA Division-I PHE Dte.
Emergency rectification work for distribution line,repairing of bursting,ferrule valve restopration of road and laying of balance distribution line at Dalurbandh ,AB pit ,Ambagan and its adjacent area for smooth running of water supply within Ramnaga