Loading…
Loading…
895 results • Latest
Additional work for rising main towards Itapara including interconnection with JL-3 rising main under RCFA Division-I PHE Dte.
Balance work of laying 250 mm dia HDPE pipe line and PWD road crossing from Semalaya to Kendra Khottamdihi intake pump house site under Kendra Khottamdihi water supply scheme under RCFA Division-I PHE Dte.
Modification and strenghthening work of collecting main to feed the IEP and balanced work for distribution line at DVC Shalinara para of Ramnagar water supply scheme for smooth running of distribution system within pandabeswar block under RCFA Divisi
Repairing ,restoration and other allied work Shymla village ,Bhuri village and forfori village under Shymla W/S scheme under Jamuria Block the district of Paschim Bardhaman under RCFA Division-I PHE Dte.
Balance laying of 90 mm dia HDPE pipe line near Bonjemary with necessary allied works under RCFA Division-I PHE Dte.
Additional work for laying 90 mm Dia parallal line including installation of valve ,construction of valve chamber ,road restoration and allied works within Zone-VII Part-C within Malbahal OHR distribution Zone under RCFA Division -I PHE Dte.