Loading…
Loading…
11,472 results • Latest
CIVIL WORK
CIVIL WORK
CIVIL WORK
CIVIL WORK
Liquid Chlorine, Technical conforming to IS 646 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MID RANGE ANALOG DISTANCE SENSOR-DT50, MID RANGE DISTANCE SENSOR-DS35, COOLING DEVICES BEF-KP- DX50/DT20
RECHARGEABLE BATTERY BANK, TYPE: VRLA BATTERY, CAPACITY: 400AH, DC BUS VOLTAGE: 400V, NO OF CELLS: 1
CIVIL WORK
CIVIL WORK
CIVIL WORK
Mass Production Mining Technology Services - Per metric tonne basis - Under Ground Mining; Continuous Miner; Coal
CIVIL WORK
CIVIL WORK
CIVIL WORK
CIVIL WORK
SMART TEMPERATURE TRANSMITTER, 12-32VDC
1. Reparing and rewinding of 112-kW, 550Volts, 1470 -RPM, MP make Sq. induction Motor for MMV fan and 40HP, 550V, 1470-RPM, induction Motor of Dhemomain Incline Colliery under Sodepur Area.
CIVIL WORK
PYROMETER, 750-1600DEGC
CIVIL WORK
IV Cannula Fixator Dressing (Q2)
CIVIL WORK
Repair of burnt TSU and its relocation to another sub-station at Area Complex under Kunustoria Area
Hiring of 02 Nos. Submersible pumps (100 Mtr Head) for dewatering of R-VII seam at Amritnagar Colliery
FLY ASH BRICK AS PER IS 12894
Complete repairing 200KW, 3.3KV, Slipring Motor of Bansra Colliery under Kunustoria Area.
1. TRIPLEX PLUNGER PUMP, 34-35L/MIN
REDUCER, SA234WP22CL1, IBR
Switch Board 6.6 kV, 5 panel, FLP, VCB, comprising 1 no. 630A for incomer and 4 No. of 400 A, 4 panel, comprising 1 no. 630A for incomer and 3 No. of 400 A for out, 6.6kV, 400A CTR 400A- 200A/5-5A, 400A CTR 300A-150A/5-5A, 400A CTR 200A-100A/5-5A, 400A CTR 150A - 75A/5-5A, ACB, 550V, 400 A CTR 300A-200A/5-5A, 400 A CTR 200A- 150A/5-5A, 100 A CTR 100A-75A/5-5A
Auxiliary Mine Ventilation Fan
work
HT POWER TRAILING CABLE, 4C, 25MM2
work
Calibration of 21 nos. of Riken Keiki Co. make Multi Gas Detector for two quarters
CIVIL WORKS
PLUMBING WORK
SPINDLE ( MAT CODE 247110102), V PULLEY ( MAT CODE 247110124), HOUSING ( MAT CODE 247110127)
CIVIL WORK
CYLINDER, ROLL BALC 12-14, 04.06. 008/352, C, CYLINDER, ROLL BALANCE 8-11, 04.06. 008/2, Delivery Days CYLINDER, ROLL BALC 1-7, 04.06. 008/299, A
CIVIL WORK
PLATE, END, DWN: 004.06. 025.0000845, RING, ADJ, DWN: 004.06. 025.0000845
CIVIL WORK
CIVIL WORK
HOSE, FLEX, SS321, 3/4IN, 0.9M
GUIDE PIECE, 3.46. 01.31. U/70035C, DWI: 5C
CONSTRUCTION OF PUKUR GHAT NEAR KISHAN GORAI HOUSE AT BARABANI
CIVIL WORK
INSTALLATION OF HIGHMAST LIGHT(ELECTRIC) AT DURGAMANDIR UNDER BARABANI VILLAGE
Bevel Planetary Gearbox for Bucket Wheel Drive of Bucket Bridge Reclaimer
SOLAR PV STREET LIGHTING SYSTEM AT PALPARA FROM DURGA MANDIR TO BARABANI FP SCHOOL