Loading…
Loading…
12,075 results • Latest
Construction of guard wall at Company Doba bathing ghat at Sansad No.- XXI, P. S. No.-215 under Ukhra Gram Panchayat under APAS,
INSTALLATION STREET LIGHT AT BOOTH NO 46
CONSTRUCTION OF COMMUNITY HALL AT DAV PARA AT BOOTH NO.46
Beautification of Suko pukur ghat with chatal at Suko para at Sansad No. - XXIII, P. S. No.-217 under Ukhra Gram Panchayat under APAS,
High visibility reflective vest
Construction of PCC road from H/o. Chattaranjan Das towards Rabir Fuchka shop near Rath-tala Shiv mondir at Sansad No. - XXII, P. S. No.-216 under Ukhra Gram Panchayat under APAS,
Construction of chatal with tin shed at Shiv mandir infront of S. N. Roy house at Sansad No. - XII, P. S. No.-206 under Ukhra Gram Panchayat under APAS,
CONSTRUCTION OF CHATAL AT SWANSAN GHAT AT BOOTH NO.40
FIRE STATION (Pkg. CS-02) at IISCO Steel Plant, Burnpur.
SEAL RING FOR SHAFT SEALING FOR TURBO BLOWER M/C NO. 1.068. 028-029 TYPE SL8. ARTICLE NO. 1-180230-001, SHAFT SEALING RING FOR TURBO BLOWER PART NO: 3-405102-004 TYPE/MODEL: SL8REFERENCE 10682602002 ITEM 0
Asansol Division: 1) Provision of tool kit set to signal technicians for maintenance of signalling gears. 2) S&T work i/c/w Provision of S&T maintainers room & store room at stations in the section of SSE/Sig/1/ASN & SSE/Sig/RRI/ASN. 3) S&T work i/c/w Provision of S&T maintainers room & store room at stations in the section of SSSE/Sig/MDP & SSE/Sig/JSME and 4) S&T work i/c/w Provision of S&T maintainers room & store room at stations in the section of SSE/Sig/1/UDL & SSE/Sig/2/UDL and S&T Supervisors office at Andal.
Asansol Division: Signalling work in connection with the works (i) ASN-03 Sitarampur Yard Improvement and Upgradation of different yards under Sr. DEN/1. (ii) ASN-05 Yard Improvement and Upgradation under Sr. DEN/2 (iii) ASN-04 Yard Improvement and Upgradation of different yards under Sr. DEN/3 (iv) ASN 02 Yard Improvement and Upgradation for Asansol Yard using Axle counter and other signaling work.
Moving Contact and fixed contact of 3TF
Annual Operation and maintenance of Searsole Zone under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2025 to 31.12.2025)
Withdrawing, supplying, aligning Relaying of 80 mm dia PVC pipe line, repairing of street stand post and other allied works at Goylapara under Tirat Gram Panchyat under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte.
Carring, stacking of different dia (80 mm to 700 mm dia) C.I./D.I. specials, valves grannual chlorine etc including surface dressing, road base at Searsole Stack yard under RCFA Division-I PHE Dte.
Additional laying 200 mm dia MS water pipe line with 600 mm dia MS casing pipe for Railway crossing between Chinchuria (CCR) and Sitarampur (STN) at KM 34/8-9 (Sitarampur end of LC No 12/A/E) in Asansol Division under RCFA Division-I PHE Dte
Repairing of Store room, approach road towards Stack Yard and other allied work at Benali Boosting station under RCFA Division 1 PHE Dte.
Gasket for Air Brake Hose Coupling
COUPLER ROD (FOR AIR BRAKE) BOXN WAGON
Bulk water connection at Siddhi Apartment, S.C. Lane near Anjana Cinema, NSB Road, Raniganj under Asansol Municipal Corporation.3rd Call
Interconnection at Ethora OHR site with Rising main and distribution network including repairing of structural bridge near Panchgachia under JJM Under RCFA Division-I ,PHE, Dte
Additional work for laying Rising Main of Augmentation of Jamuria Rural (Zone-I and Zone-II) under RCFA Division-I PHE Dte.
Annual Operation and maintenance of Ratibati under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Urgent basis surging of 10 (Ten) nos 200 mm dia river bank tube wells at river of Ajoy (for Shymla W/S Scheme) under Jamuria Block under RCFA Division-I PHE Dte.
Construction of Godown for stacking of Cholorine at Searsole Head Work site under RCFA Division-I PHE Dte.
Distribution Network for RCFA Part-II Piped Water Supply Scheme Including FHTC and allied work under RCFA Division-I PHE Dte. (Zone 9B) (Part-A)
Interconnection at Baliapur OHR Site (02 nos. OHR), Barabani OHR and Barabani Railway crossing of RCFA Part-II Zone-19 PWSS under RCFA Division-I PHE Dte.
Asansol Division: Replacement of Analog 5watt & 25watt VHF set by new Digital VHF sets for Asansol Division.
Making round o clock guarding arrangement by engaging Gunman through Govt. Registered Ex-military security Agency for the office of the Superintending Engineer, RCFA W/S Circle Office of the Executive Engineer, RCFA Div I, P.H.E. Dte. including P
Construction of drain at Hazrabera booth no 49
Installation of Two nos Submersible at Hazrabera Booth no 49
Construction 8 Nos. of 0.3m Thick RCC sectionalization Stopping in RVIIA Seam for sectionalised of Panel 4 Sub Panel C1 at Shyamsundarpur Colliery.
Making round o clock guarding arrangement through Govt. Registered Ex-military security Agency at different places of Kalyaneswari store and premises etc. under RCFA Div I, P.H.E. Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Construction of Kabarstan shed nirman at Hazrabera booth no 49
Sinking of 6 (Six) nos 200 mm dia river bed tube well including collecting main in the river of Damodar at Surjanagar under ASTA Water Supply Scheme under RCFA Division-I PHE Dte.
Additional work of laying of rising main at Surjanagar Head Work Site to High lift site and interconnection of collecting main to CWR in the river of Damodar under Augmentation of RCFA PartII PWSS under RCFA DivisionI.PHE Dte
Balnce work of distribution pipe line of Kanska ZoneII PartB from OHR to Pathanpara under Augmentation of Birudiha W/S Scheme under RCFA DivisionI PHE Dte
Construction of PCC road from Shib Mandir to Bapi Lohar House at Prayagpur Canel Par Booth No 54
Urgent repairing and restoration at Distribution Network within Dabor OHR and MS work at Lohat Kata More under RCFA Division-I PHE Dte.
Construction of Atchala at Prayagpur Kora Para Booth no 54
Improvement of CC drain culvert from house of R. K shaw to Aradhya apartment at gopalpur ward no 55 booth no 8 under borough 5 AMC
Sinking of Submersible at Ramkrishna Mission Prayagpur Booth no 53
CONSTRUCTION OF PCC ROAD FROM VIP COLLONY TO SHIB SHANTI COLLONY, WARD NO-10, BOOTH NO-134, UNDER AMC
CONSTRUCTION OF DRAIN FROM SHIV MANDIR TO VIP COLLONY , WARD NO-10, BOOTH NO-134, UNDER AMC
Construction of Pucca Ghat at Bandha Ghat Pukur at Prayagpur Booth no 54 Sansad XXIII
CONSTRUCTION OF PCC ROAD FROM VIVEKANANDA COLLONY TO VIP COLLONY, WARD NO-10, BOOTH NO-134, UNDER AMC
Construction of New Panel Room at Barachak pump house within Asansol Municipal Corporation.2nd Call
Construction of Gate at Prayagpur Samsan Booth no 54
INSTALLATION OF LED STREET LIGHT(WITH POLE) AT SHIBDANGA VIVEKANANDA VIP COLLONY FROM DURGA MANDIR TO SHIV MANDIR, WARD NO-10, BOOTH NO-134, UNDER AMC