Loading…
Loading…
2,265 results • Latest
Annual Plan RGP 28/27 Alanchery Pottakulathunkal Padi Road Maintenance
GENERAL-GENERAL-RM 2026-27 -RC 2 - zone 3 One year Running Contract for various PWD Roads under Roads Section Eraviperoor in Pathanamthitta District 9 road stretches for a length of 31.82 km-Work-General Civil Work
Annual Plan RGP 27/27 Krishi Bhavan Koottunkal Colony Road Maintenance
GENERAL-GENERAL-RM 2026-27- RC 2 - zone 2-One year Running Contract for various PWD Roads under Roads Section Eraviperoor in Pathanamthitta District 9 road stretches for a length of 38.058 km-Work-General Civil Work
Annual Plan RGP 08/27 Side Wall Construction for Bus stand Nizhaloor padi Road
Capital work of 110kV Substation Pathanamthitta- Renovation of Inspection Bunglow at 110kV Substation Pathanamthitta
Annual Plan RGP 39/27 Chuttippara Malamannel Road Maintenance
Cleaning the disc insulators checking the tightness of bridgings and earth clamp condition of hardware fitting and Vibration damper of 66 kV feeder under LMS, Moozhiyar as Sabarimala Pre Season Work
Cutting and clearing thick, thorny and light jungle growth along 66 kV Vandiperiyar Kochupampa SC feeder including the LILO portion to 66 kV Sub station Vandiperiyar under LMS, Moozhiyar
Felling tree branches along the entire line route cutting and clearing thick thorny jungle growth from Loc 10 to14 and Loc 29 to 58 of 66 kV Kochupampa Pampa Triveni DC feeder and 66kV SC feeder from Manjumala tapping point to 66 kV Peerumedu subst
Annual Plan RGP 09/27 Hospitalpadi Kollamthundippady Road Maintenance
Office room renovation
Maintenance Work and Roofi ng of Terrace Floor at Office Complex, Thiruvalla
Annual Plan-Koipuram GP - Pro. No 322/26- Mulamukk Vattamala Alumthara road concreting ward 3
REBUILDutilityshifting KALATHIKKODU PALLANA PUTHENVELIPPADI IN ARANMULA GP PIPE LINE WORKS
RECONCRETING
GENERAL Reconstruction for culvert in Pallickal Thengamam Road ch0/100 General Civil Work
TMGP 2026-27 Pro.No. 15/27 - Pallakuzhi Kurush Paramballi Kizhakkethil padi Road Concrete in Ward 05
TMGP 2026-27 Pro.No. 19/27 -Vellappallil padi Paranthuvelil padi Road Concrete in Ward 09
Desk and Bench Set for Classroom/Training Area (Q2)
Pro.No. 31/27 -Maintenance of Kizhakke Charuvil Sanketham Road in Ward No.09
RE CONCRETING
(JJM)-5th SWSM -WSS to Mylapra, Malayalappuzha and Vadasserikkara Panchayaths - Construction of 6LL OHSR,7LL GLSR, pump house at Pezhumpara, Supply and Laying of Pumping Mains, Supply and Erection of Pumpsets, etc at Vadasserikara Panchayath -Gene
Renovation of ACF Quarters near Pulimukku in Ranni Range during the year 2026-2027
RECONCRETING
RECONCRETING
RECONCRETING
Annual Plan-2026-27 Aranmula GP Pro.No.64/27 -Mangattumoolapadi Nalkkalikkal Road Re-Concrete Ward-9-General Civil Work
Annual Plan-2026-27 Aranmula GP Pro.No.125/27 -Madathilethupadi Sreekarishnavilasam Road Renovation Ward - 19-General Civil Work
Facility Management Services - LumpSum Based - District Veterinary Centre; Installation, Commissioning and testing of Veterinary Xray Diagnostic Facility; Consumables to be provided by service provider (inclusive in contract cost)
New bus stand mukkuzhipalam road renovation
Pramadom GP Pro no141/25-26 Construction of Bleeching Powder Store for F H C
Pro.No.330/25-26 Vellappara pezhumkattil road concrete-Ward-8
Pro no 306/25-26 Pathway for CHC Disabled Toilet
JJM- 5th SLSSC- WSS to Naranamoozhy Panchayath- Providing 1348 FHTCs in Naranammoozhy Panchayath from ongoing schemes and by extension- Balance Work
Pramadom GP Pro.No.186 Construction of Hand Washing Units in School-Pramadom GP(Retender)
Pro no.308/25-26 choothupara vengavila road side protection in ward no 14(Retender)
Execution of Miscellaneous Repair Maintenance, upgradation and Construction works in Zone IV a cluster of Central warehouse located at Trivandrum and Kunnamthanam on Annual rate Contract basis 2026-27
Pro No 92/25-26 Vallivila Thattaserril Road Side Protection Wall in ward in ward no 17 (Retender)
Pro.No.332/25-26 Pulari junction Rani rice mill padi road reconcreting -Ward-6
Aranmula Sree Parthasarathy Devaswom in Aranmula group Providing temporary illumination and light arrangements on hire basis to Thiruvonathoni and Kadavu in connection with Onam festival 1202ME
Pramadom GP Pro no 144/25-26 Construction of Truss Work for F H C
DBHS DBHSS Kavumbhagam, Thiruvalla Urgent Repair and Replacement of Electrical Installations in the Classrooms of the High School Wing on the Third Floor and the Higher Secondary Classroom on the Ground Floor Consequent to the Civil Maintenance Wor
Supply of materials for works under MGNREGS on rate contract basis for Construction of paramodi padi thundumannilpadi road concreting w9 (Retender)
Supply of materials for works under MGNREGS on rate contract basis for Construction of vellangattilpadi valiyavilamodi road concreting w3 (Retender)
Supply of Materials for Vattavila Puthenpurapadi road concreting
Hiring Airconditioned Vehicle 2026-27
Annual Plan- JP PTA 25-26 PRO NO. 902/25-26-- PATHANAMTHITTA GOVERNMENT HOSPITAL TOILET MAINTENANCE, MINI MCF AND BOTTLE BOOTH CONSTRUCTION- General Civil Work (RETENDER)
Pro.No.82/25-26 Vattakkavu kalkurisupadi thengummuripadi road side wall (Retender)
Entry and Mid Level Desktop Computer (Q2)