Loading…
Loading…
704 results • Latest
Ward No. 27, Sonaru Patel Nagar PCC road construction work from Shri Sunil Kumar's house towards Shri Sunil Singh's house
Construction work of Hume pipe drain from the house of Shri Ved Prakash ji towards the house of Shri Jaidev Prasad near Mirzapur Nohta bridge in Nagar Parishad Fatuha Ward No. 26
Construction of a PCC road and hume pipe nala in ward -15,Mirjapur nohhta from sri ashok ji house to sri madhusudan ravidas house under the Fatuha Municipal Council.
Proposed out sourcing of USFD testing of track (Rails) for the year 2026-28 in VSKP, BZA, GNT & GTL divisions of SCoR: Carrying out through USFD testing of running Rails & Welds (excluding flange testing) including level crossings, lead portion of points and crossings and scabbed rail testing of all types of Rails by NBC (Need based concept) method under traffic conditions as per provisions of IR's "USFD manual & Specifications for Ultrasonic Testing of Rails and Welds" with latest correction slips & related instructions, duly marking defects , submission of daily reports and storing backup data as specified & directed with Contractor's USFD machine. NOTE: (The SRT/DRT machine should have minimum of 9 probes B- scan (including 37 degree forward /backward probe for detecting bolt hole cracks). with contractors USFD machine.
For Selection of Agency for Payroll & Attendance Management System with Manpower Using Tally Software.