Loading…
Loading…
3,644 results • Latest
Please Refer to BOQ.
Please Refer to BOQ.
Construction of Flood protection work at Mankote and Dabraj Mendhar
Construction of Flood protection work at Chajjla Mendhar.
Construction of FPW at Ari Sarawali Patti and Sruthi at Mendhar
Construction of FPW at Mendhar Town
Construction of Flood protection work at Bhatidhar Mendhar
Construction of Additional Class Room at PS Sarooi,Zone Sathra,District Poonch
Construction of Boundary Wall in PS Sarooi,Zone Sathra,District Poonch
Construction of Additional Class Room at PS Moh Naikan Loran,District Poonch
Construction of Boys Toilet at PS Sarooi,District Poonch
Construction of Toilet Complex at DIET Poonch
Construction of 1 ACR and Science Lab in Girls High School Degwar-M,District Poonch
Construction and Maintenance of L023-link road Chaktroo Timbra road km 0.700 to U Timbra , PACKAGE NO. JK11-4066, PMGSY-IV, Batch-I of 2026-27 Block- Sathra DISTRICT POONCH (using waste Plastic LENGTH - 2.00 Kms)
Construction and Maintenance of road from L028 Km 1st of Basoni Hansal road to Khana Goda Gopal, Package No. JK11-4534, PMGSY-IV, Batch-I of 2026-27, Block Balakote District Poonch. (Using Waste Plastics) Length 2.92 Kms
Construction and Maintenance of road from L028 (Link road) Seri Khwaja Malhan road Km 3.400 to Chakli, Package No. JK11-4120, PMGSY-IV, Batch-I of 2026-27, Block Lassana, District Poonch. Using Waste Plastic, Length-3.0 Kms
Construction and Maintenance of L023-(Link Road)Mundamar Sanglagalli Km 3.0 to Jabber Maiwala, Package No. - JK11-4093, PMGSY-IV, Batch-I of 2026-27 Block- Surankote DISTRICT POONCH (using waste Plastic Length 2.0 km)
LED Batten Light (LED Tube Light) (V2) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2), Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) (3 (3 ))
High Beam Focus Remotely Controlled Security System
As per the specifications of NIT and BoQ.
REPAIR TO ROAD AND ROAD FURNITURE AT VARIOUS UNIT IN POONCH AND GULPUR, SEKHLU AND NATU UNDER GE 881 EWS
Construction of FPW at confluence point Hari Budha Surankote
Construction of FPW at Hari Budha Surankote
Please Refer to BOQ.
Please Refer to BOQ.
Please Refer to BOQ.
Integrated Surveillance Grid alongwith Accessories
SURVEILLANCE QUADCOPTERS (DAY) ALONGWITH ALLIED ACCESSORIES
BONE INJECTION GUN(IO) RELOADABLE TRAINER
Surveillance Grid alongwith Accessories for FDL
Mahindra Maximile Ultra Four, Mahindra Maximile Syntec F Two, Mahindra Maximile Power Steering Fluid, ATF NWS nine six three eight Transfer Case Oil, Mahindra Maximile Elite and SAE eighty W ninety, Mahindra Maximile Dot four, Maxi clean Urea, fifteen W forty Mahindra Maximile Full Synthetic, Advanced Full Synthetic Engine Oil five W thirty, Tata Motors Ultra Long life Coolant, ATF Dexron VI Full Synthetic Multi vehicle, SAE eight W one forty Tata Motors Genuine, Tata Motors Genuine Dot four, fifteen W forty Engine Oil, fifteen W thirty Tata Motors Genuine Engine Oil
Concrete sub base and storm water for volleyball court
Construction of Girls Toilet at Middle School Kamsar,Zone Poonch
Construction of Boys Toilet at MS Danna Nona Bandi,Zone Nangali
Construction of Boys Toilet at MS Degwar-M,Zone Nangali
Construction of Boys Toilet at HS Karmara,Zone Poonch
Construction of Boys Toilet at HS Kanuiyan,Zone Poonch
Construction of Boundary Wall in Middle School Wand Gagian
AMC Charges for Operating Expdr for Hybrid School
Complete overhauling of Rotary pump of TATA incl repair and replacement of roller set oil seal gasket, Patti set and bush, O ring, Repair pressure pipe line, Repair of pressure pipe line
Construction of road from Fazalabad Panyala Morh to Mohalla Muglian near PHE Tank ,Tehsil Surankote District Poonch
Annual Fixing of Rates for Work Shop Material for the year 2026-27
Construction of 03 Additional Class Room in Girls Middle School Trichal