Loading…
Loading…
159 results • Latest
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Under BISScheme-II) (Q2)
Camerafor CCTV System (V3) (Q2)
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Customized AMC/CMC for Pre-owned Products - UPS; NUMERIC; Comprehensive Maintenance Contract (CMC); Quarterly; No
Group work :- 1. Kanalus-Porbandar Section- Construction of RUB in lieu of LC No. 45 C class non Interlocked at KM 912/9-913/0. 2. Kanalus - Porbandar Section- Construction of RUB in lieu of LC No. 26 C class non Interlocked at KM 882/10- 883/0. 3.Kanalus-Porbandar Section- Construction of RUB in lieu of LC No. 70 C class non Interlocked at KM 947/5-6. 4. Jetalsar- Wansjaliya section- Construction of RUB in lieu of LC No. 79 C class Traffic Interlocked at KM 167/4-5. 5.Jetalsar- Wansjaliya Section - Construction of RUB in lieu of LC No. 70 C class non- Interlocked at KM 150/1-2. 6.Jetalsar- Wansjaliya section- Construction of RUB in lieu of LC No. 96 C class Engg. Interlocked at KM 189/6-7. 7.Rajkot-Somnath section: Construction of RUB in lieu of Manned LC No. 64 C Engg. Non-Interlocked at Km 79/2-3. 8.Jetalsar- Wansjaliya section - Construction of RUB in lieu of LC No. 84 C class non-Interlocked at KM 171/4-5. 9.Rajkot-Somnath section: Construction of RUB in lieu of Manned LC No. 74 C Traffic at Km 93/3-4. 10.Kanalus - Porbandar Section: - Elimination of 2 Nos. of Level Crossings by Provision of Road Under Bridges (Twin Box) at LC Nos. 6 and 30. 11. Kanalus - Porbandar Section: - Elimination of 5 Nos. of Level Crossings by Provision of Road Under Bridges (RUBs) at LC Nos. 3, 10, 13, 15, and 29. (With maintenance period up to 4 years as per latest guideline)
Ice Lined Refrigerator (Q3)