Loading…
Loading…
304 results • Latest
Maintenance of 2.4 MGD Capacity Water Treatment Plant including entire Collecting Main along with Rising Main at WTP Campus at Lakshmanpur under Raghunathpur W/S Scheme (German Assisted) of Raghunathpur Sub-Division under Purulia Division, PHE Dte.
Maintenance of 2589 KLD Capacity Water Treatment Plant including entire Collecting Main at WTP Campus under Raybandh W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Daily Operation mtc. of rising main all distribution system, opening closing of sluice valves with all allied wprks related to water supply under Balitora W/S Scheme (Zone-II) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (
Daily Operation mtc. of Rising Main all Distribution system, opening closing of sluice valves with all allied works related to water supply under Maheshnadi W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte.(w.e.f. 01-0
Daily Operation Mtc. of all Distribution System, opening closing of sluice valves with all allied works related to water supply under Raghunathpur W/S Project (German Assisted) Zone-I-A of Raghunathpur Sub-Division under Purulia Division, P.H.E.
Daily Operation Mtc. of Distribution system, sluice valve, community stand post under Arra W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone-III) (w.e.f. 01-09-2026 to 31-08-2027)