Loading…
Loading…
304 results • Latest
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Sutabai W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Daily Operation maintenance of Rising main all distribution system, sluice valve, and pump operation maintenance with allied works at S.D. Hospital Campus under Raghunathpur Sub-Division, PHE Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Daily Operation Mtc. of Rising Main opening closing of sluice valves with all allied works related to water supply under Madandi W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Preparation of Detailed Project Report for the work of Hura Puncha Road from 0 to 22 Kmp Widening from intermediate lane 5.50 m to 2-lane 7.00 m road and Strengthening work under Purulia Highway Division, P.W. (Roads) Dte in the district of Purulia.
Construction of Toilet at Pabra Haridih High School attached Hostel within Kashipur Development Block
Repair and Renovation at Sonathali Kalapathar School attached Hostel within Kashipur Development Block