Loading…
Loading…
302 results • Latest
Daily Operation mtc. of 150mm, 200mm, 250mm, 300mm 350mm dia rising main (Total length 30122 mtr.) of surface water supply scheme for Manbazar- II Block (Part) under Purulia Sadar Sub-Division, PHE Dte. For the period of 01.09.2026 to 31.08.2027
Repairing of Damage pipeline at Ramjibanpur (Near Bandu River) of Satra Water Supply Scheme under Arsha Block.
Balance work of Construction of Integrated Township of Residential and Non-residential Buildings including Water supply, Sanitation, Electrification, Firefighting, etc. for RTPS Township (Phase-I) in CISF area, RTPS, District- Purulia, West Bengal
Preparation of Detailed Project Report for the work of Manbazar Puncha Road from 0 Kmp to 8 Kmp, Widening from intermediate lane 5.50 m to 2 lane 7.00 m road and Strengthening work, under Purulia Highway Division, P.W. (Roads) Dte in the dist of PRL
Procurement of spares for CW Pumps of Unit-6 during overhauling under TM Dept.,STPS
Operation and Maintenance for 10 years of the 10.315 km Puruliya Bypass Section of NH-32 including balance work and dismantling and re-construction of defective or damaged section in the state of West Bengal