Loading…
Loading…
302 results • Latest
Maintenance of inter connecting pipeline of newly constructed OHR at Ajodhya and Caretaking for site office including maintenance under Purulia Sadar Sub-Division, PHE Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation of distribution system at Zone-II Balarampur W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system under Sirkabad W/S Scheme under Purulia Division, PHE Dte. For the period of 01.09.2026 to 31.08.2027
Day-to-day operation and maintenance of 250 Cum capacity OHR and distribution system of Zone - V of surface water-based water supply scheme for Manbazar - II Block (Part) under Purulia Sadar Sub-Division, PHE Dte. For the period of 01.09.2026 to 31
Daily Operation mtc. of 250 mm DI rising main sluice valve, air valve etc. for Medical College W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Day-to-day operation and maintenance of 250 Cum capacity OHR and distribution system of Zone - IV of surface water-based water supply scheme for Manbazar - II Block (Part) under Purulia Sadar Sub-Division, PHE Dte. For the period of 01.09.2026 to 3