Loading…
Loading…
306 results • Latest
S&T work in connection with the construction of RHS between Km 283/5 - Km 283/7 towards JOC end at Adra in Adra Division.
Maintenance Contract for Electrical Maintenance jobs of Coal Handling Plant of Unit 5 and 6, under CHP (E/M) dept, STPS. for 02 years.
Supply of hand operated Rotary Barrel Pump as per spec-dual directional pump of inlet 01 inch, deliver 05 liters in 20 turn, wetted components Steel, Cast Iron, NBR, complete with 03 no. rigid suction tube for use on 50-210 litre barrel. Make: GROZ, OZAR, JCP, GIZMO or Equivalent.
Procurement of All In One PC
"Construction of 3rd line work including earth work, blanketing, minor bridges, major bridges, LC work and other miscellaneous works for DFC feeder route of Indian Railway Standard Loading, execution of indoor & outdoor S&T works, execution of general electrical works, installation and commissioning of overhead equipment (OHE) for traction and power supply in connection with the 3rd Line work of Chandil-Purulia section in Adra Division of South Eastern Railway." on Engineering, Procurement & Construction (EPC) Mode.