Loading…
Loading…
4,934 results • Latest
CCONSTRUCTION OF PCC ROAD FROM HANIF ANSARI TO MASZID AT GOLKUNDA
CONSTRUCTION OF PCC ROAD FROM KAPUR MODAK HOUSE TO JADU MODAK AT JALIKA OF BELMA GP
CONSTRUCTION OF PCC ROAD ANIL MAHATO HOUSE TO NIDIR MAHATO HOUSE AT MALTHORE KASHITAIR
CONSTRUCTION OF BATHING GHAT BARAMSA BANDH AT MALTHORE
CONSTRUCTION OF PCC ROAD FROM GORAI PARA TO BAURI PARA AT JALIKA OF BELMA GP
Discharge/Earthing Rod assembly as per RDSO spec no- ETI/OHE/51(9/87) with A&C slip no. 1 for using 25 KV OHE with top hook assembly etc.
Construction of Shade Net House Area 240 sqm 24m X 10m for cultivation of horticulture crops of Ramesh Singh Ghatwal
Construction of Shade Net House Area 240 sqm 24m X 10m for cultivation of horticulture crops of Brajalal Mahato land
Construction of Shade Net House Area 240 sqm 24m X 10m for cultivation of horticulture crops of Parshuram Das Baisnab land
New- Excavation of WHS of Ramakanta, Chakradhar, Shankar Paramanik AND Others Land
Afforestation (Sonajhuri) at Haripada Mahato Land AND Gandhiram Mahato Land
Afforestation (Sonajhuri) at Kalipada Mahato Land
Standardization of level crossing by shifting gate barrier, Improvement of visibility, road surface and gate lodge standardization at 16 Nos level crossings gate between PRR-KSX-RJB, ANR-RUI, MHQ-CRP & TT Line section in Adra Division.
Adra Division- Barricading/fencing of road is required to protect running Railway track to prevent such incidents of vulnerable location and road repair under the jurisdiction of DEN(North)/Adra.
Supply and loading into wagons/ hoppers 344594 cum 50 mm gauge machine crushed hard stone track ballast at PAKUR/BAKUDIH/RAJGRAM/PINARGARIA/BARHARWA/TALJHARI quarry for Adra Division (Measurement of ballast will be done at destination).
Repair, operation and maintenance of filter Plant at Garga Pump house at Bokaro steel city for three years.
Afforestation (Sonajhuri) at Chittaranjan Mahato Land
Afforestation (Sonajhuri) at Durjadhan Mahato and Haripada Mahato Gandhiram Mahato Land
GR C Construction of new drain and cement concrete road starting from house of Ajay Sen to Malay Sen at Chira bari within ward no 07 under Purulia Municipality(213/2)
GR A Reconstruction of CC road starting from Chirabari Primary school to near house of Sachita nanda mahato at Chira bari witin ward no 07 under Purulia Municiapality(212/4)
Re- Excavation of WHS of Pastubala Sing Land AT Kendapara
GR T CONSTRUCTION OF ROAD STARTING FROM KHAN KHATAL TO BELAL MASZID AT RANIBANDH WITHIN WARD NO-09 UNDER PURULIA MUNICIPALITY(203/1)
New Excvn of WHS at Dinabandhu Mahato AT SAGA MOUZA
GR P Reconstruction of Road , Drain and Culvert strating from Anwar Hussin house to Nurul Qureshi house within ward no 08 under Purulia Municipality.(200/2)
Emergent Post monsoon patch repairing work of different stretches at Raghunathpur Chandan Kairy Chass Road (SH 8) from 1.50 km to 13.00 km by providing patching pot holes reparing potholes and 20 mm premixed carpeting work of Raghunathpur Sub Dn
Emergent repair of Hura Kashipur Adra Raghunathpur Road from 18.00 kmp to 22.00 kmp by repairing Pot holes providing 20 mm thick Premix surfacing and Premix Seal Coat under Raghunathpur Sub Division of Purulia Division PWD during the year 2024-25
Repair and replacement of Wooden beam Burgahs ceiling and other allied work of District Excise Office Building under Purulia Construction Sub Division PWD of Purulia Division PWD during the year 2023-24
Additional works of District Excise Office Building under Purulia Construction Sub-Division of Purulia Division PWD in the district of Purulia during the year 2024-25.
Emergent repair of Kashipur Gourangadihi Ghatrangamati Road from 6.00 kmp to 10.00 kmp by repairing Pot holes providing 20 mm thick Premix surfacing and Premix Seal Coat under Raghunathpur Sub Division of Purulia Division PWD during the year 2024-25
Emergent repair of Kashipur Gourangadihi Ghatrangamati Road from 10.80 kmp to 15.10 kmp by repairing Pot holes providing 20 mm thick Premix surfacing and Premix Seal Coat under Raghunathpur Sub Division of Purulia Division PWD during the year 2024-25
Provision of New Electronic Interlocking work at Jhantipahari (JPH) station in connection with dismantling of UP and DN main line cross over & one UP Passenger platform & one Goods shed line in Adra Division of South Eastern Railway.
Back pack water cum foam mist, Life Safety Jacket, Multipurpose Nozzle For fire fighting system, HIGH CAPACITY PORTABLE FIRE PUMP, Foam making branches FMB 5X, Self Oscilation Monitor, Piercing Nozzle, Portable chlorine gas leak detector, Fire Fighter Helmet with flame resistance 3 Watt LED, Cooling vest, 35 feet Alloy Aluminium Extension ladder as per IS 4571 1977, DRY CHEMICAL POWDER, Fire Hydrant valve washer or gasket, DELUGE VALVE 150NB, DELUGE VALVE 80NB, Rubber washer for female coupling of hydrant valve Hydrant Landing Valve oblique type, AIR RELEASE VALVE, NRV Gun Metal Verticle Type, GM NRV VALVE FOR WATER LINE VALVES AND JETTING NOZZLES 20NB, 20 MM or 3_4 Angle valve in Deluge valve for fire spray sprinkler system, ANGLE VALVE PART NO 4304 106 600 MW, 50 MM or 2 Angle valve MOC Brass in Deluge valve for fire spray sprinkler system, Y TYPE STRAINER 600 MW, Strainer Y 1_2 BSPT 300 PSI
Construction of PCC road from Dhananjoy Sahis house to Lakru Sardar House at Sargo Sansad