Loading…
Loading…
6,420 results • Latest
NIGHT ENABLED QUADCOPTER (KAMIKAZE)
Construction of 03 ACR at MS Kandra under PAB 2025-26
Infrared Torches with Fitting Attached on Ak-47/203 Rifles
Permanent Restoration of road from T03-BLOCK BOUNDARY TO HATHAL Under SASCI Rajouri
Permanent Restoration of road from Prat A Prat B upto Km 4th of T03 Under SASCI Rajouri
Permanent Restoration of road from L021-T02 KM 3rd to Block Boundary (Stage-II) Under SASCI Rajouri
Permanent Restoration of road from L046 Brevi to Kote Kabu Under SASCI Rajouri
Providing/Installation/Testing and Commissioning of LRS suitable for 300 KW/400 HP BHEL make 3-phase 50Hz, 6.6 KV slip ring type vertical solid shaft HT 6.6 KV slip ring motor pumping unit No1 and 4 including control/safety devices at LIS Rajal.
Remodelling of Govt.Primary School Saranoo.
Improvement/upgradation of metka kanthole road extension
Macadamization of Dalhori Kanthole road km 1st
Fabrication, P/F installation testing and commissioning of Slip Ring Assemblies, carbon brush holders ,locking arrangement along with allied job for 400 HP,HT BHEL make vertical solid shaft 6600 volt motor No 4 and5 at installed at LIS Rajal.
Please refer BOQ
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2)
Solid Cushion Tyres (V3) (Q3)
KIT PAD ASSY, SHOE KIT LINED BRAKE FRONT, EDC W/H MAIN FROM MSSL
Items for conduct of volley ball competition
AC COMPRESSOR, POLY PRO PELENE MOULDED ARM, WIRING HARNESS, FAN 24V DC 150MM, TOGGLE SWITCH, ASSY OF SAFETY BELT, RADIATOR HOSE
PC with Monitor i7 processors 14th gen, 512 GB HDD, 16GB RAM
Electronic Fuze and Dropping Mechanism
Repair of Advance Night Vision Device 107664
FACIA BUMPER FRT, GRILL BUMPER FRT LOWER, BEARING DOUBLE BALL 3G, TUBE LIGHT, JANATICS DOUBLE SOLENOID VALVE 24V, BUZZER, FUEL FILTER ELEMENT, RETURN AIR FILTER
In-situ Construction/Installation of 95 Nos. of Boundary Pillars in Baljaralain Forest of Kandi Range, Rajouri Forest Division
In-situ Construction/Installation of 72 Nos. of Boundary Pillars in Telna Forest of Kalakote Range, Rajouri Forest Division
Repair/Renovation of GMC and AH Rajouri (Under Stage Contract) for the Year 2026-27 (3rd Call)
Repair / Renovation / Addition / Alteration and other Maintenance work of Various Buildings in PWD (RandB) Sub Division Rajouri (Under Stage Contract) for the year 2026-27
Construction of R/Wall for Protection of Land at Nonial near Govt. Middle School Nonial (Part - II)
Construction of road from PMGSY road to Garu Mohalla via Patara Mohalla Godhar
REFER TO BOQ
Please refer BOQ
Mahindra new Bolero Scorpio Top Model
Permanent Restoration of road from L052- Rajouri To Gurdanbala Road Part II Pkg no JK12-196 Under SASKI Rajouri
(i)Improvement/Upgradation of road from Panja Chowk to Kheora, Rajouri Rs 29.14 lacs (ii) Gujjar Mandi to Busstand Rajouri Rs 29.14 lacs (iii) Main road Malik Market via Gujjar Hostel Rajouri 19.42 lacs (3rd Call)
(i) Macadamization of road from Keri to Rattimitti 38.84 lacs (ii) Main road to Shokat Mohalla ward no 06 Agrati North 19.50 lacs (iii) Shahpur to Khankadhara 38.82 lacs (iv) Shiv Mandir to Thatyalli 29.12 lacs (v) Doongi Brahmana/Shahpur to Sham
Improvement of Bamboodigalla to Pottagalla road under potholes
Construction of Boundary wall at Govt. High School Bravi.
Construction of Boundary wall at Govt. High School Dalogra.
Repair and Maintenance of Compound Wall at Govt. Women ITI Kalakote.
Construction of Boundary wall at Govt. High School Tatapani
Permanent Restoration of road from Kotedhara to Soker PkgNo. JK 12-326.
Fuel system and Tank Cleaning of Mahindra Scorpio