Loading…
Loading…
2,846 results • Latest
Refer to BOQ
BOQ
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
As per NIT
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Tab Telmisartan 40 mg
turbinespares
refer to BOQ
Refer to BOQ
Refer to BOQ
Spinach Mulayam 50g Pack, Knol Khol 100g pack, Beetroot 50g pack, Fenugreek 100g pack, Purple Top Turnip 500g pack, Radish OP 100g pack, All Green Spinach 500g pack, Nasik Red Onion 100g pack, Vegetable Kit pack, Green wonder Coriander 500g Pack, Girja Cauliflower 10g pack, Cauliflower 75 no Golden 10g pack, Cauliflower Suhasini Plus 10g pack, Green Flash Cabbage 10g pack, AS10 Pea 1 kg pack, Radish 50g pack Kalash, XP Red Onion 10g pack, Broccoli 10g pack, Marigold seed 100 seed pack, Bioinsecticide Verticillium 1kg pack, Biofungicide Trichoderma 1kg pack, Beekeeping kit Glove Bee veil Brush Feeder Hive Tools, Wheelbarrow trolley, Cover Sheet Silpaulin 30x20, Garlic Seed Bhima Purple, Micorihza 4 kg pack, Vermi Compost 10 kg pack
BOQ
Refer to BOQ
Construction and Maintenance of Road L041-(Link Road) Badgam to KhouraPackage No. JK19-4024, PMGSY-IV, Batch-I of 2026-27, Block-Banihal, District Ramban Length 1.750 Kms Adv. Cost excluding maintenance but inclusive of GST-Rs. 409.96 Lacs
Constt. and Maintt. of Road L054-(Link Road) Kk road Km 14th to Nagarna Pkg No. JK17-4217, PMGSY-IV, Batch-I of 2026-27, Block-Thakraie, District Kishtwar (Using Waste Plastics -2.600) Length 2.600 Kms Adv. Cost excl. maintt. but incl. of GST
Constt and Maintt of Road L039-(Link Road) Hinjhal to Bajar Basti Thandishawa via Gila BastiPackage No.JK19-4003, PMGSY-IV, Batch-I of 2026-27, Block-Banihal, District Ramban Length 1.700 Kms Adv. Cost excl. maintt but inclusive of GST 448.11 lacs
Construction and Maintenance of Road L036-(Link Road) PMGSY road to Ludder Package No. JK17-4210, PMGSY-IV, Batch-I of 2026-27, Block-Paddar, District Kishtwar 2.400 Kms Adv. Cost excluding maintenance but inclusive of GST-Rs. 564.85 Lacs
Refer to BOQ
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
Installation of new 220V battery bank along with battery charger at GSS Ramban
Electrical works in connection with Additional coaching facilities at Srinagar Railway Station, provision of crossing station alongwith goods facilities at Sopore station and one additional loop line at Baramulla station on BAHL-BRML section.
as per nit
as per nit
Refer to BOQ
refer to BOQ