Loading…
Loading…
2,846 results • Latest
Sesame Seed, PP Chemical Chlorpyriphos 20 PERCENT EC, Micronutrient, Sprayer Manual, Display board, Linseed, SSP, Rhizobium Biofertilizer, Sprayer Battery Operated, Weedicide Atrazine, PP Chemical Emamectin Benzoate 50g pack, Micronutrient organic manure 5 kg pack
Selectorized Multi Press (Q3)
Pull Trolly with Hydraulic Mechanism for lifting, Frot wheels :180x50 mm with bearings and rear 4 wheels 80x70 mm with double bearings capacity 2600 kg make Neel , pronix, ACE. Item to be supplied as per specification.
boqbusduct
Supply Survey Erection Testing and Commissioning for Creation of 250 KVA Substation at Arbal Banihal for deep drilling bore well pump room electro mechanical equipment sump tank delivery tank pipe network and water filling station under ED JPDCL Bato
boqheatexchanger
Construction and Maintenance of Road L031-Guzzer Gurinall End Point to Aripora Package No. JK17-4023, PMGSY-IV, Batch-I of 2026-27, Block-Inderwal, District Kishtwar Length 2.600 Kms Adv. Cost excluding maintt. but inclusive of GST Rs. 595.35 Lacs
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Customised Ambulancewith Equipment (Q2)
attached
Attached
Construction of Garage for Parking of Fire Tenders at F AND ES Batote
as per Nit
Professional Operating Software, Advanced Malware Protection Software
Supply, Installation, Testing, and Commissioning (SITC) of Three (03) Nos. 5 HP Dewatering Pumps (One Each for Adit 2F, Adit 2P, and Cable Tunnel) Along with Associated Control Panels, Piping, Valves, Supports, and Accessories in Power House Stage-II
Provision for Providing and Laying Vitrified Floor Tiles of Approved Make and Specification in Offices and Other Allied Areas of Power House Stage-II
Replacement of Damaged and Worn-Out Sanitary Installations and Supply, Installation and New Fixtures in Bathrooms of Power House Stage II
Refurbishment and Upgradation of Pantry at Machine Hall (EL 708.30) and Control Room (EL 713.00) of Power House Stage-II
Provision for Construction of 01 No. Wash Room/Bathing Section on the Turbine Floor of Power House Stage-II including Sanitary, Plumbing and Finishing Works
Ration Kit (Q4)
BOQ
Perindropil 4 mg + Amlodipine 5 mg + Ind [Perindropil 4 mg + Amlodipine 5 mg + Indapamide 1.25 mg]
Permanent Restoration of Maitra to Billawat Road, Package No. JK04-76, Stage-I, Phase-VI, Block and Distt. Ramban, Length 10.00 by way of construction of crated walling, Semi pucca Walling including Pucca Drain under SASCI
Permanent Restoration of Kanthamorh to Mahakund road, Package No. JK14-45, Stage-I, Block Sangaldan Distt. Ramban, Length 4.50 kms by way of construction of crated walling and Semi pucca R wall under SASCI
Rate Contract for Supply of Spares Minor Stores Equipments Hardware Items and T and P Equipments Required from Time to Time for Day to Day Operation and Maintenance of Distribution Power Network of this Division During the Financial Year 2026 27
Refer to BOQ
Engagement Of Consultant for Providing Consultancy Services Including Survey, Detailed Investigations Study Structural Design Estimation Preparation of Detailed Project Report getting it vetted from State Technical Agency STA and Principal Technical