Loading…
Loading…
2,846 results • Latest
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
Refer to BOQ
Refer to BOQ
refer to BOQ
refer to BOQ
Refer to BOQ
Refer to BOQ
BOQ
refer to BOQ
refer to BOQ
refer to BOQ
refer to BOQ
Providing and Fixing Damaged tile in bathrooms and floors including replacement of floor tiles of 10 no bathrooms to maintain water slope in dormitories ( 1 - 17) nos or as per requirements at yatri Niwas Chanderkote
Providing and Fixing of Broken Glasses , doors , Hardware items , PVC sheets and other allied works at Yatri niwas Chanderkote.
Rectification of outer Pole light including requirement of Cable and other allied items for entire yatri niwas including Manpower at Chanderkote.
Providing Good Earth , Garden plants and equipments at Yatri Niwas Chanderkote
Cleaning and Levelling of Area backside of Dormitory no 6 to 10 during yatra 2026 from langar side at Chanderkote
Providing water Proofing treatment to sump tank to stop leakage of drinking water before yatra 2026 at yatri niwas Chanderkote
Repair , maintenance , Installation and Dismantling of ROs( 22 areas) for Pre- Yatra and Post Yatra -2026 at Yatra Niwas Chanderkote .
Cleaning of Overhead Tank and sump Tank for Drinking water before yatra-2026
Cleaning of Septic Tank , Ugradation of Manholes and Maintenance of Sewage pipeline before Yatra-2026 at Yatri Niwas Chanderkote
Renovation work by way of white-washing to external area of all Dormitories at yatri Niwas Chanderkote before yatra-2026
Renovation work by way of white-washing to internal area of all Dormitories at yatri Niwas Chanderkote before yatra-2026.
Stage Contract For Replacement of Sanitary Items in all dormitories of yatri Niwas Chanderkote During Yatra 2026.
Stage Contract For Replacement of Electric Items in all dormitories of Yatri Niwas Chanderkote During Yatra 2026.
Refer to BOQ
Hewagan to Dhanmasta Road under SASCI
Temporary Restoration of roads on emergency basis by way of clearance of slipssnow likely to occur during the financial year 2026-2027. Karole to Kumet, Package No. JK04-226, Stage-II, Phase-IX, Block and District Ramban, Length 26.15Kms
AS PER NIT
Ukhral to Bhingara Road, Package No JK04453, Length 13.10 Kms
Permanent restoration of road Sirthangle Katyara, Package No JK04-216 by way of construction of Crated Wall, RCC/Kucha Pucca Walling, Scupper, GSB, WBM, Back cutting.
Hiring of vehicle Mahindra Bolero / Scorpio base variant or above Model 2023 June Onwards for the period from April 2026 to March 2027 including GST along with driver of Banihal Locality on the monthly Hire basis for official use of Executive Engin
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
refer to BOQ