Loading…
Loading…
2,637 results • Latest
Const of Bathroom near Mohallah Masjid Hill Wno 2 Pyt Lancha Block Thuroo Distt Reasi under Capex Budget PRI for the year 2026-27.
Const of Protection work near sadeeqee mohallah masjid wno 3 Pyt Lancha Block Thuroo Distt Reasi under Capex Budget PRI for the year 2026-27.
Construction of P work at Sahreen Mohallah w no 3 in the mohalla of Mohd IserailPyt Budhan B Block Thuroo Distt Reasi under Capex Budget DDC for the year 2026-27.
Construction of P Work in the mohalla of Mohd Ashraf Lone S O Akbar Pyt Budhan B Block Thuroo DisttReasi under Capex Budget DDC for the year 2026-27.
Construction of New Building for Health Sub CenterG ari District REASl under ABDP for the year 2026-27
Construction of Mesh Wire fencing Surjandhar Nursery Compt. 15/R of Reasi Range with fencing 1000 rft with Mesh Wire conforming to the product code GA-BW all SQPCC fence SQPCC post concrete, under CAMPA NPV 2026-27 of Reasi Forest Division
Construction of Closure in 36/R Bhimgarh of Reasi Range with fencing in 2000 rft with 5 stranded with 2 Criss cross conforming to the product code GA-BW all SQPCC fence post concrete, and 810 rft Mesh Wire Fencing with SQPCC and mesh under CAMPA NPV
Construction of Mesh Wire fencing Beaulian Nursery in Compt. 65/Th of Thakrakote Range with fencing 2000 rft with Mesh Wire conforming to the product code GA-BW all SQPCC fence SQPCC post concrete, under CAMPA NPV 2026-27 of Reasi Forest Division
Construction of Closure in 49c/Th Gungus of Thakrakote Range with fencing in 4010 rft with 5 stranded with 2 Criss cross conforming to the product code GA-BW all SQPCC fence post concrete, and Patch sowing 1000 nos. CAMPA NPV 2026-27 of Reasi FD
Construction of Mesh Wire fencing Chinkah Nursery Compt. 05/Th of Thakrakote Range with fencing 1110 rft with Mesh Wire conforming to the product code GA-BW all SQPCC fence SQPCC post concrete, under CAMPA NPV 2026-27 of Reasi Forest Division
Construction of Closure in 77/K Anji of Katra Range with fencing in 5800 rft with 5 stranded with 2 Criss cross conforming to the product code GA-BW all SQPCC fence post concrete, and Patch sowing 1000 nos. under CAMPA NPV 2026-27 of Reasi Forest Di
Construction of Closure in 69/R Tote of Reasi Range with fencing in 6400 rft with 5 stranded with 2 Criss cross conforming to the product code GA-BW all SQPCC fence post concrete, and Patch sowing 1000 nos. under CAMPA NPV 2026-27 of Reasi Forest
Construction of Closure in 24/R Bakkal of Reasi Range with fencing in 4200 rft with 5 stranded with 2 Criss cross conforming to the product code GA-BW all SQPCC fence post concrete, and Patch sowing 1000 nos. under CAMPA NPV 2026-27 of Reasi Forest
Construction and Maintenance of Road from L154-(Link Road) Jyotipuram to Power House Salal Road KM 5th to Nawabad Package No. JK20-4159, PMGSY-IV, Batch-I of 2026-27, Block-Reasi, District Reasi. (Using Waste Plastics 7.300 Kms) Length 7.300 Kms
Construction and Maintenance of Road from L137-pwd road Pannasa gandali to Blada Package No. JK20-4264, PMGSY-IV, Batch-I of 2026-27, Block-Thakrakote, District Reasi. (Using Waste Plastics 5.500 Kms) Length 8.000 Kms
Providing laying and fitting of HDPE Pipes gravity mains for Morha Karamkatha from Zero Morh Passerawali Pyt Budhan B Block Thuroo under District Capex Budget 2026-27 (DDC Grant).
Rate Contract for Design, Supply, Installation, Testing and Commissioning of (A) 11 Mtr. High Mast lighting system using ST Pole 11 Mtr. long with 4x150 watts LED Luminaries and (B) 60 watts LED Street Lights in different areas of ED-Reasi
Supply of Misc. IT items to SMVDSB, F.O.R. Engineering Store, Banganga, Katra.
Supply, laying, erection and commissioning of overhead LT, AB Cable of street light fixture from Gate no. 1 to Gate no. 2 with connecting road and Sports Ground (Stadium) underground cabling along with flood lighting at SMVDU, Kakryal, Katra
Construction and Maintenance of Road from L619-(Link Road) BMG road Tramla to Ghoragali Package No. JK20-4204, PMGSY-IV, Batch-I of 2026-27, Block-Mahore, District Reasi. (Using Waste Plastics 10.000 Kms) Length 10.000 Kms
Construction of P Work Farooq ahmed S o Abdul Rashid and others Pyt Bagodas Block Chassana
General Repair/Maintenance Work (Civil, Carpentry, plumbing, Aluminium, Water proofing) of HVC lodge, Academic Blocks, Central Workshop, Engineering store at SMVDU, Kakryal, Katra
Construction of Drain from Kousar Pani Nallah Houtan to Khachi Nallah Ward No.3 Pyt. Larh Pyt Larh Block Mahore Distt. Reasi under Capex PRI For the year 2026-27
Face-lifting in various buildings / Structure of Shri Mata Vaishno Devi Shrine Board at Sanjichhat Sector.
construction of water tank on main road pouni reasi near Rakesh Anand Kumar mohalla py saloon. Pyt Saloon Block Pouni Distt Reasi under capex DDC for the year 2026-27
Const. of Lane and allied Works from Main Road to NHO Subash Chander W.No 01 Pyt Saloon Block Pouni Distt Reasi under capex DDC for the year 2026-27
Construction of tile work near the house of suneeta devi and others mohalla pyt saloon. Pyt Saloon Block Pouni Distt Reasi under capex DDC for the year 2026-27
Tile work on the lane from Des Raj house to Middle School Sarna W.No.6 Pyt LATORI DHANORI Block Katra Distt Reasi under capex BDC for the year 2026-27
Const. of bathing ghat at w.no 6 near shiv temple deva mai chowk pyt. kotli bajalian Pyt Kotli bajalian Block Katra Distt Reasi under capex DDC for the year 2026-27
Construction of toilet Complex NHO Barkat ali S/o Seel Mohd w no 1 Pyt.Budhan B Block Thuroo Dist. Reasi under Constituency Development Fund (CDF) Scheme by Honble MLA 56-Gulabgarh Assembly Constituency for the year of 2026-27.
Construction of water storage Tank at Chach mohalla ward no 6 Pyt Dugga Block Arnas Distt Reasi under Capex Budget PRI for the year 2026-27.
Const. of Toilet complex in the mohalla near Masjid Ne osiw no 3 under Scheme DDC for the year 2026-27
Const. of Road from CFC to jamia MasjidNeo si under Scheme PRI for the year 2026-27
Renovation of Lane from Vikas Chand house to Karnail Chand House at Kans Brahmana W.No 10 Pyt Lower Talwara Block Pouni Distt REASI
Const of culvert Near land of Pardeep kumar moh w.no.3 PRI Pyt Lower Talwara Block Pouni Distt REASI
const. of W Tank at Yaqoob mohalla w.no. 7 PRI Pyt Lower Talwara Block Pouni Distt REASI
Construction of B Path with RBM from Badder Mohalla to Shamshanghat W.No. 1 PRI Pyt Lower Talwara Block Pouni Distt REASI
construction of well at malair w.no.1 village saloon. PRI Pyt Saloon Block Pouni Distt REASI
Const. of platform with allied work at sangali devsthan dhanwa ward no. 04 Pyt Saloon Block Pouni Distt REASI
Const of lane with tile and allied work at malaid OBC mohallah ward no. 01 Pyt Saloon Block Pouni Distt REASI
Const. lane and drain from Main Rd. to kuldeep Raj Ex Man Mohalla ward no. 05 Pyt Gajore Block Pouni Distt Reasi under capex DDC for the year 2026-27
Const. of Link Road from Main Road Nallah to NHO Alam Din W.No 04 Pyt Gajore Block Pouni Distt Reasi under capex DDC for the year 2026-27
construction of T Road Jaba to Saloli Mangh Pyt Tuli Upper-A Block Chassana distt. Reasi under Scheme DDC for the year 2026-27
construction of T Road PMGSY Road Manudarman to Piro Road Pyt Tuli Upper-A Block Chassana distt. Reasi under Scheme DDC for the year 2026-27
Constt of toilet complex at Pry School Pangla W.No. 1 Pyt Chassote A Block Chassana distt. Reasi under Scheme PRI for the year 2026-27
Const. of Balance work of Wooden foot Bridge at Mandihar nalla ward no 04 05 Pyt Sarsote Block Chassana distt. Reasi under Scheme PRI for the year 2026-27
Const. of Breast Wall Near Jamia Masjid Sharief Manjkote Pyt Manjikote Block Chassana Under Capex Budget PRI for the year 2026-27.
Const. of Pacca Path Steps PMGSY Road to Kali Mata Mandir Devsthan Pyt Manjikote Block Chassana Under Capex Budget PRI for the year 2026-27
the Const. of Drain Mohan Singh Mohalla to Nanak Chand Mohalla Pyt Manjikote Block ChassanaUnder Capex Budget PRI for the year 2026-27.
Const. of Drain Near Jamia Masjid Ganjoli Pyt Manjikote Block Chassana Under Capex Budget PRI for the year 2026-27.