Loading…
Loading…
249 live174 closing this weekmost from Department Of Fertilizers and Bhakra Beas Managemet Board
249 results • Latest
NATURAL COLOUR TRANSPARENT FLEXIBLE PVC PIPE
M. S. PLATES (SHEET) CONF. TO IS-2062 GRADE E-250 A (TESTED QUALITY) SIZE: -32MM. THICK
COPPER SOLDERING TUBULAR 60 AMP, COPPER THIMBLES CRIMPING 120 SQ, CRIMPING TYPE COPPER LUGS 185, CRIMPING TYPE COPPER LUGS 150, CRIMPING TYPE COPPER LUGS 1240
Switch Disconnectorsand Fuse Combination Units (Switch Fuse Unit) Conforming To IS/IEC60947 (Part3) (Q2)
Construction of Stone Massonry Water Recharging Harvesting Structures Crate Wire Structures Retaining walls and Crate Wire Silt Retention Structure at Village Haripur Manguwal Diwari bharatgarh Chotti jhakhiana saho majra sarsa nangal Ropar
Short Term Maintenance of Nangal (PB/HP Border) - Sri Anandpur Sahib - Kiratpur Sahib Road from KM 44.700 to KM 67.700 and KM 77.850 to KM 81.000 of NH-503 (Extn.) excluding ROB 88-C and ROB 92-C in State of Punjab for 2026-27
Construction of stone masonry water recharging structure village saho majra bada pind bharatgarh hirdapur and sarsa nangal
Construction of stone masonary structure village saho majra bada pind
NFN/CIVIL/685/2026/13 DATED 29/09/2026 ARC for Wild Growth Clearance in Township and Factory Area during the year 2026 27
Overhauling of Boiler Auxiliaries like ID fans, FD fans and their auxiliaries, Ducting, Dampers and Gates for 01 unit of 210 MW BHEL make units of 4X210 MW capacity at GGSSTP, Ropar
Removal of Trash and Inspection and Mtc. of Log Boom at Gobind Sagar at Bharka Dam during 2026-27.
FILLING OF HIGH PRESSURE NITROGEN GAS CYLINDER AT 130KG/CM2 OF PURITY 99.99% IN COMMERCIAL GRADE CYL
Watermist and Caf Fire Extinguisher High Pressure Backpack Type (V3) (Q2) (3 (3 ))
CS SEAMLESS PIPES IN RANDOM LENGTH OF 5-7 METERS CONF. TO ASTM A106 GR. B SIZE: 10" (250 NB) SCH. # 4
Split Air Conditioner, Floor Mount Type (Tower AC) Marked to IS 1391 (Part 2) (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Finishing wall with cement based paint such as snowcem, robbiacem etc. of Workshop Canteen and WATER PROOFING Of Office of ADE and JE Civil and Office Passage of Xen P and D Cell and A.O workshop Nangal BBMB
7866 /P-1/EMP- 13439 dated 24-09-2026 Procurement of Anion Exchange Resin and Cation Exchange Resin required for operation of D.M. plants
leasing out Cafeteria at Satadree Island Park at Ropar Headworks near river Satluj and Sirhind canal
Annual Operation and Maintenance Contract for round the clock routine services, preventive maintenances and break down services for 66/11KV Grid Substation, 11/0.433KV Substations including all transformers, PSS, DG Sets, HT and LT Panels and Cables
Tent Extendable Frame Supported4Mand2M Complete with Accessories (V2) (Q2)
Industrial Panel Space Heater with Built-in Adjustable Capillary Thermostat
Shade Netsfor Agricultureand Horticultureasper IS16008 (Part2) (Shade Nets Madefrom Mono Filament Yarns) (Q3)
FAN M2BAX 315S suitable for 132KW, Fan cover M2BAX 315 suitable for 132KW, END SHIELD D MC M2BAX315 63 BRG, END SHIELD N MC M2BAX315 2P 63 BRG, TERMINAL BOX FRAME MC, COVER OF TERMINAL BOX, V RING 95 suitable for 132KW, V-RING 80 ANTIFR NDE
Carbon steel seamless pipe in Random length of 5-7 Meter Conf. to ASTM A 106 GR. B Size: 1 inch, Carbon steel seamless pipe in Random length of 5-7 Meter Conf. to ASTM A 106 GR. B Size: 1.5-inch, Carbon steel seamless pipe in Random length of 5-7 Meter Conf. to ASTM A 106 GR. B Size: 2-inch
MECHANICAL SEAL TYPE E01 D28 FOR PC 4 AND 5 PUMP
Construction of All Technical civil works of 66 KV Sub-Station Gadhram Khurd (Under operation circle Ropar)
Overhauling of HVR Transformers on site for ESPs of Stage II and III of GGSSTP, Rupnagar lying at GGSSTP, Rupnagar.
Procurement of roller chain for primary crusher of stage I and II GGSSTP, Ropar
SWITCH KEYPAD YCAL/YCWL (736305), SPARE FOR CHILLER UNIT OF HVAC SYSTEM
11KV Switchboards for Water Works Substation 9VCB, Installation, testing, commissioning of 11KV Switchboards for Water Works Substation 09 VCB, 11KV Switchboards for Sector4 Substation, commissioning of 11KV Switchboards for Sector4 Substation, 11KV Switchboards for Sector7 Substation, nstallation, commissioning of 11KV Switchboards for Sector7 Substation., 11KV Switchboards for Admin Building Substation, commissioning of 11KV Switchboards for Admin Building Substation, 11KV Switchboards for Workshop area Substation, commissioning of 11KV Switchboards for Workshop area Substation, 11KV Switchboards for Lab area Substation, commissioning of 11KV Switchboards for Lab area Substation
FOAM CONCENTRATE FOR PRODUCING MECHANICALFOAM FOR FIRE FIGHTING (V2) Conformingto IS4989 (Q3)
New Insulating Oils (V2) Conformingto IS335 (Q2)
Non-Metal Helmetfor Firemanand Civil Defence Personnel (V2) ISImarkedto IS2745 (Q2)
Complete actuator seal kit for B03 NG valve (Main NGTV) Seal kit Part no: MA0248698 Make: Valmet Act, Complete actuator seal kit for Bleed valve (NG to burner) Seal kit Part no: MA0248692 Make: -Valmet
GT-2 Series 4032, Model 6VU, Pipe 150 NB, Full Flow 1190 LPM, 2 Mercury Switches, Marking Full Flow/, GT-3 Series 4022, Model 4VD, Pipe 100 NB, Full Flow 670 LPM, Marking PumpOn/Pump, GT-4 Series 4022, Model 4VU, Dial 100mm, Marking, GT-5 Series 4022, 2Mercury Switches
Overhauling of transformers at NFL Nangal
NOTICE INVITING TENDER FOR ANNUAL RATE CONTRACT FOR REWINDING OF ELECTRIC MOTORS AT GANGUWAL AND KOTLA POWER HOUSES
256 GB SSD HARD DISK DRIVE WITH INTERFACE NVMe. 2
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; As per NIT; As per NIT
1/2" (NPT) Double Compression Cable Gland. Detailed specifications as per attached Annexure-1., 1 1/4" (NPT) Double Compression Cable Gland. Detailed specifications as per attached Annexure-1.
SUPPLY OF PRE-STRESSED REINFORCED CEMENT CONCRETE (PSC) SLEEPERS (T-2496) FOR 52 KG RAILS
MAGNETIC PIN CONTAINER, PAPER WEIGHT SUPERIOR QUALITY., CHISEL POINTED STAPLES
Procurement of spares for Heat exchangers for PA fan Hydraulic Coupling Oil system of 210 NW units
ARC for Misc. Wood Work Jobs at Township and Factory Area during the Year 2026-27