Loading…
Loading…
249 live174 closing this weekmost from Department Of Fertilizers and Bhakra Beas Managemet Board
249 results • Latest
Fieldbus Junction Box for Profibus PA Model: F2-JB-I6. CGB Part no: 122019 Make: pepperl fuchs
Sealing kit for Intercooler-1, Sealing kit for Intercooler-2, Sealing kit for Intercooler-3, Sealing kit for Intercooler-4
Custom Bid for Services - Annual Maintenance of Generator and Turbine equipment of 04 No Generating Machines of 126 MW each at Bhakra Left Bank Power House Similar Category AMC/CAMC of Hydro Energy Power Plants Operation And Maintenance Of Switchyard Operation and Maintenance Power House/Power Plant Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance and Installation of Plant Systems/Equipments
Manifold for Reciprocating Ammonia Feed Pumps
compact Filter for HYDRO GT 450 E10
Spiral wound gasket Size 40 NB X 150, Spiral wound gasket Size 40 NB X 600, Spiral wound gasket Size 50 NB X 150, Spiral wound gasket Size 50 NB X 600, Spiral wound gasket Size 80 NB X 150, Spiral wound gasket Size 100 NB X 150, Spiral wound gasket Size100 NB X 600, Spiral wound gasket Size150 NB X 150, Spiral wound gasket Size150 NB X 600, Spiral wound gasket Size 200 NB X 150, Spiral wound gasket Size 200 NB X 300, Spiral wound gasket Size 200 NB X 600, Spiral wound gasket Size 250 NB X 300, Spiral wound gasket Size 300 NB X 150, Spiral wound gasket Size 300 NB X 300, Spiral wound gasket Size 350 NB X 150, Spiral wound gasket Size 600 NB X 150
NFN/CIVIL/686/2026/12 DATED 22/09/2026 ARC for Misc Wood Work Jobs at Township and Factory Area during the Year 2026 27
Testing of oil of transformers at NFL Nangal
ELGI AIR LUBE PLUS PT NO. 0099805C IN 210 LITRE BARREL FOR ELGI AIR COMPRESSOR
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Electrical; As per NIT; As per NIT
3.3 KV, 315KW, 993RPM 6 POLE 400 FRAME, SQURRE CAGE INDUCTION
EOI for Introduction and Implementation of Employee Group Insurance Scheme at IIT Ropar
Note Sorting Machines (V2) (Q2)
Chamber clearance of Silt in various blocks/bungalows and clearance of sludge filter Bed in STP at BBMB Nangal Township.
BACK PULL OUT ASSEMBLY FOR PIT PUMPS
Providing parapet wall for protection of muck of spoil bank along right side of drain of NHC at various RDs under Nangal Dam Sub Division, BBMB Nangal
Estimate for Provding and Installtions of Vacuum Pumps, Construction of Transformer Shed, Board and Grills for Drainage Trench in Samlah Pharpur Lift Irrigation Scheme at RD 28000/L of A.S.H.C in Changer Area of Shri Anandpur Sahib.
HYDRAULIC CENTRIFUGES C1 AND C2
Providing and laying patch work with close-graded premix surfacing material of 20mm thickness at inspection bank road from RD 9645 to 32726 and 32726 to 62164 Right side of Nangal Hydel Channel.
Mild Steel Wirefor General Engineering Purposeasper IS280 (Q2)
Procurement of spares for window split Package AC at GGSSTP Ropar
Procurement of consumable spares for Air Compressors installed at main plant and DFAH GGSSTP, Rupnagar.
Entry and Mid Level Laptop - Notebook (Q2), Scanner (V3) (Q2) Projector (MMP) (Q2), Projector Screen (V2) (Q3) Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Household Refrigeratorsmarkedto IS17550 (V2) (Q2)
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2), Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Television (V3) (Q2), Portable Electric Indoor Air Purifier Conforming To IS 17531 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Estimate of UGPL for 1 No. Deep T/Well at Vill.- Phukapur (Block- Nurpur Bedi) in Distt. Rupnagar (Under 502 No. Deep Twell Scheme) (Part - B)
Procurement of self propelled fully mobile tyre mounted Hydraulic Mobile Crane (Hydra) of 12 ton capacity complete with standard accessories, tools and documentation and hydra crane 20 ton capacity(Pick andcarry type)
Supply 11KV Switchgear Panel, Installation and Commissioning of 11KV Switchgear Panel
Convection Heaters - Room Heater, Blower (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sweeping Broom (V5) (Q4), Domestic Wiper/Wiper Mopper (V3) (Q4), dust pans (Q4), cobweb brush (Q3), General Purpose Hand Gloves (V2) (Q3), Waste Container (V3) (Q4), HDPE Bucket (V2) Conforming to IS 3730 (Q4), Domestic Mugs - Bathroom (Q3), Facial Tissue Papers(V3) (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
O-ring Size 57 X 63 X 3 mm, Oring Size 52 X 58 X 3 mm, O- ring Size 45 X 51 X 3 mm, O-ring Size 138 X 144 X 3 mm Neoprene, O-ring Size 138 X 144 X 3 mm viton, O-ring Size 30 X 36 X 3 mm, O-ring Size 33 X 40 X 3.5 mm, O-ring Size 129 X 134.4 X 2.7 mm, O-ring Size 400 X 410 X 5 mm, O- ring Size 22 X 27 X 2.5 mm, O-ring Size 242 X 262 X 10 mm, O-ring Size 123.2 X 137.2 X 7 mm, O-ring Size 150 X 162 X 6 mm, O-ring Size 4.5 X 9.0 X 2.25 mm
electricalpurpose (V2) ISImarkedto IS7809 (Part3/Sec1) (Q2)
Foot Valves for Water Works Purpose as per IS 4038 (Latest) (Q3), Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3), Swing Check Type Reflux Valves for Water Works Purposes (Single Door Pattern) (V2) as per IS 5312 (Part1) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Fuel Water Separator, Oil Filter
Providing and Fixing 80 mm thick paver block along right side of NHC from Ganguwal Power House main gate to Charanganga escape and also providing 60 mm thick paver block in canal colony main link road to 41-DD at Ganguwal
Repair and replacement of RHR Gate no. 18.
Providing and Application of Anticorrosive Epoxy based Enamel, Chlorinated Rubber Paint and Epoxy Painting to Lift Shaft, Stair Flights and External Surface of New Prilling Tower along with its Steel Structure Supports at NFL Nangal Unit.
7860 /P-1/EMP- 13253 dated 11.09.2026 Procurement of H.T.Nuts and Bolts (FS Group) for the year 2025-26 for whole plant at GGSSTP, Ropar.
7859/P-1/EMP-13423 dated 11-09-2026 Procurement and replacement of various types of Fire extinguishers such as ABC type, CO2 type, and Mechanical form type for firefighting services at GGSSTP, Rupnagar.
Procurement of spares for FD fans
Procurement of clarified water pumps of stage-II and III DM plants at GGSSTP Ropar
NFN/CIVIL/680/2026/11 DATED 11/09/2026 Providing and Application of Anticorrosive Epoxy based Enamel Chlorinated Rubber Paint and Epoxy Painting to Lift Shaft Stair Flights and External Surface of New Prilling Tower along with its Steel Structure
Air Break Contactors (Q3), Vacuum Contactor Conforming To IS/IEC 60470 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Sodium Silicateforusein Foundries (V2) Conformingto IS6773 (Q3)