Loading…
Loading…
1,308 results • Recent activity
Bare Pump Assembly for Oil Spray Dosing
Polytetrafluoroethylene (PTFE) Thread Sealing Tape (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2026/B/7075804 Dated : 06-01-2026 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Preventive / Breakdown maintenance of complete lighting equipment and cables at Main Plant, Micro Hydel Project and all the colonies (including 415V LD System) at GGSSTP, Roopnagar
Routine, Preventive, Breakdown and Shutdown Maintenance of 415V AC Switchgears at main Plant and CHP Switchgears, 220V DC, 110V AC power supply system, ESP Control Panels including HVR Transformers and rapping motors control, Hydrogen Plant, local co
R and R of various mechanical assemblies/ parts of By-pass gate no. 3 at Nakkian Forbay 2025-26
R and R of various mechanical and electrical components of 10 Tonnes capacity Mono-Rail installed at Head Regulator Nangal for the year 2025-26.