Loading
Loading…
Loading…
3,603 results • Recent activity
Supply and Installation of a New Batteries for 5 KVA online UPS under Buyback method to the Dept. of Geology, PU.
Main Grinding Wheel for SMS Slab Grinder
Dragging out the floor ash under D Pass of ESP by using the Front End Bar Loader to facilitate the manual unloading hopper ash at D Pass
Dragging out the floor ash under C Pass of ESP by using the Front End Bar Loader to facilitate the manual unloading hopper ash at C Pass
Supply of New Tyres to the Ashok Leyland Bus (TN30-AW-7149) under Buyback method at Periyar University, Salem.
Dragging out the floor ash under B Pass of ESP by using the Front End Bar Loader to facilitate the manual unloading hopper ash at B Pass