MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipes with bends and renewal of eroded pipes of length at about 15mtr length along with bends between Mill Outlet Elbow and Fuel Inlet Elbow during AOH 2025 26
MTPS I TM Unit I to IV Dismantling Cleaning and assembling of Main oil Tank filters and Centrifuges bowl assembly during 2026 27 for a period of One year from the date of commencement
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 deg 11 deg 10 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit II Dismantling the eroded 90 degree Ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during AOH 2025
MTPS I Mill Plant Unit III Dismantling of existing elliptical feeder discharge chutes mill 3A 3B reconditioning of released SS elliptical feeder discharge chutes and reassembling the same during AOH 2025 26