Loading…
Loading…
3,486 results • Recent activity
Mill Plant Unit I Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 1A to 1F
MTPS I Mill Plant Unit I Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece 24 Nos
MTPSI Mill Plant Unit III Coal flow system to boiler Removing the existing dislocated coal pipe lines at both left and right sides of the Boilers up to boiler at 16 meter level and re assembling the same after rectification of the pipes coal bend
A4and Legal Size Multifunction Printer (MFP) (Q2)
ARMOURD 6C FIBRE OPTIC CABLE