Loading…
Loading…
991 results • Latest
Estimate For Clearance Of Internal Section Weed Jala Deeela Jungle Butti Sarkanda Dhora Silt Etc Mannually From Inner Section Of Minor No 1 To 5, Sular Branch, Khetla Branch, Chinagra Branch Of Ladbanjara Disty
Digital Hand-held VHF Transceiver as per MHA QR (Q2), Digital VHF Base/Mobile Transceiver Set as per MHA QR (Q2) (3 (3 ))
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 360 hours; Local, Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 270 hours; Local, Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 km x 360 hours; Local, Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 480 hours; Local
P/F Mini Bus Stand at Various Places MC Lehragaga
Linear Low Density Polyethylene (LLDPE) Film (V3)
Linear Low Density Polyethylene (LLDPE) Film (V3)
Linear Low Density Polyethylene (LLDPE) Film (V3)
Linear Low Density Polyethylene (LLDPE) Film (V3)
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 30 MTR HIGH MAST LIGHTING SYSTEM FOR ENHANCED LUX LEVEL AT BPCL SANGRUR TOP
Engagement of user fee collection agency for Paind fee plaza at km 227.500 for the section from Sangrur to DogalKalan DogalKalan to Punjab / Haryana Border from km 181.805 to km 238.819 of NH-7 in Punjab
Supervision Consultants of O and M of Start of Sangrur to PB-HR Border Section from Km 181.805 to Km 238.695 of NH71 (New NH 52) and section starting from its junction with NH-148B near jakhal connecting Lehra Gaga and terminating at Sunam from km 0
HIRING OF VEHICLES AND SERVICES UNDER DMAS PROJECT
ST030142226, ST030142218, ST030142219, ST030142221, ST030142227, ST030142243, ST030142229, ST030142239, ST030142203, ST030142194, ST030142234, ST030142216, ST030142212, ST030142242, ST030142244, ST030142245, ST030142211, ST030142225, ST030142235, ST030142220, ST030142214, ST030142215, ST030142210, ST030142198, ST030142224, ST030142228, ST030142232, ST030142231, ST030142209, ST030142223, ST030142201, ST030142202, ST030142195
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Supply Instl. Testing and Comm of 11 KV Substation and DG Set with interconnections Cables with allied works at NFR Facilities at Locn. Ch KM 155_450 LHS Vill Tambuwala Tehsil Patran Distt Patiala at DAK_3 Sites on DAK Express HW Sangrur DO under PSO
Linear Low Density Polyethylene (LLDPE) Film (V3)
Dismantling of 69 nos. Quarters (H-Type 1 to 20, P-Type 1 to 42 and Class-IV 1 to 7) at Police Lines, Sangrur.
Linear Low Density Polyethylene (LLDPE) Film (V3)
Lining of watercourses of Outlet RD 29010-R of Newada Disty by Laying of U/G Pipeline of Village Kalajhar, Distt Sangrur
Linear Low Density Polyethylene (LLDPE) Film (V3)
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Linear Low Density Polyethylene (LLDPE) Film (V3)
As per tender documents
ANNUAL MAINTENANCE OF PUBLIC HEALTH SERVICES YEAR 2026-27 (TIME 01-04-2026 TO 31-03-2027) IN MANDI SANDAUR MC SANDAUR, DISTT MALERKOTLA WORK CODE-SGR-2026-072 TIME LIMIT-12 MONTHS
ANNUAL MAINTENANCE OF PUBLIC HEALTH SERVICES YEAR 2026-27 (TIME 01-04-2026 TO 31-03-2027) IN MANDI SULLARGHARAT MC SULLARGHARAT, DISTT SANGRUR WORK CODE-SGR-2026-060 TIME LIMIT-12 MONTHS
ANNUAL MAINTENANCE OF PUBLIC HEALTH SERVICES YEAR 2026-27 (TIME 01-04-2026 TO 31-03-2027) IN MANDI AHMEDGARH MC AHMEDGARH, DISTT MALERKOTLA WORK CODE-SGR-2026-073 TIME LIMIT-12 MONTHS
P/D/C/I/T/C, starting up, stabilization of ETP of 100 KLD based on MBR/SBR followed by UF Technology including all Civil, Electrical, Mechanical, Public Health, Piping, Instrumentation works including dismantling of existing ETP plant etc. Complete i
Aluminium Phosphide Formulation (V2) Conformingto IS6438 (Q2)
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Adhoc HTC Sunam
Estimate for Repair/renovation of Nabha Sub Division Office at Baladkoti
REPAIR /REPLACEMENT OF EXTERNAL ELECTRIC HT SUPPLY AND MISC WORK INCLUDING REPAIR TO E/M INSTALLATIONS WITH B/R SERVICES (OHT, PUMP HOUSE, POWER HOUSE) AND CONNECTED B/R MISC WORK AT SANGRUR AND NABHA UNDER GE (S) PATIALA
RAISING OF DB FLOORING ON ADDITIONAL APF INCLUDING ALLIED WORKS AT NGM DHURI MC DHURI DISTT SANGRUR (MB FUNDS 2025-26 AND 2026-27) PART-4 WORK CODE-SGR-2026-112
RAISING OF DB FLOORING ON ADDITIONAL APF INCLUDING ALLIED WORKS AT NGM DHURI MC DHURI DISTT SANGRUR (MB FUNDS 2025-26 AND 2026-27) PART-5WORK CODE-SGR-2026-111
SITC of HT VCB panel alongwith streetlights and allied external electrical works at STP ETP, PGIMER Satellite Centre, Sangrur, Punjab
Irrigation project STP Amargarh
RAISING OF DB FLOORING ON ADDITIONAL APF INCLUDING ALLIED WORKS AT NGM DHURI MC DHURI DISTT SANGRUR (MB FUNDS 2025-26 AND 2026-27) PART-3 WORK CODE-SGR-2026110
Estimate for Laying 1000 Ft. Long Pipeline in Agricultural Land Near Moonak Bus Stand for Drainage of Rain water and Excess Surface Water
Construction of Hall in Yishu Masih Dharamshala, Ward No. 19-20
Estimate For Clearance Of Internal Section Weed Jala Deeela Jungle Butti Sarkanda Dhora Silt Etc Mannually From Inner Section Of Ladbanjara Disty From RD 0-102854 Of Ladbanjara Disty
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Limited HTC Sunam
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Construction of all technical civil works for new 66 KV Sub-Station Dhandoli Kalan, Under Op. Circle Sangrur
CONST. OF MARKET COMMITTEE OFFICE BUILDING MC SUNAM DISTT. SANGRUR (MC FUNDS 2025-26 AND 2026-27) WORK CODE-SGR-2026-106
Estimate for remodeling reconstruction of New changal minor RD 0 to 11680 including pucca structures
Sample weighted thief and sampling winder
Linear Low Density Polyethylene (LLDPE) Film (V3)
Linear Low Density Polyethylene (LLDPE) Film (V3)
Linear Low Density Polyethylene (LLDPE) Film (V3)
Passbook or Bankbook Printer (Q2) (3 (3 ))