Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
529 results • Latest
Strengthening of Road from (i) Ichakutti More to Guibera via Ututua (L-10.100 Km.), (ii) Sonua Main Road to Kumai via Guikera Chowk (L-6.500 Km.), (iii) Dhangaon to Kotsona (L-2.500 Km.) and (iv) Chakradharpur to Chelabera Road (L-2.000 Km.)
400kV Patna - Balia ckt - 1 and 2, 400kV Naubatpur - Balia ckt - 1and 2, 400kV Biharshairf - Balia ckt - 1and 2, 765kV Gaya - Balia, 400kV Patna - Balia ckt - 1, 400kV Patna - Balia ckt - 2, 400 kV Patna - Naubatpur ckt - 2, 400 kV Naubatpur -Balia ckt - 2, 400kV Patna Balia Ckt -3, 400 kV Biharshairf - Balia ckt - 1, 400 kV Biharshairf - Balia ckt - 2, 400kV Patna Saharsa Ckt -1, 400kV Patna Saharsa ckt -2, 400 kV Barh - Patna ckt - 1, 400 kV Barh - Patna ckt - 2, 400 kV Barh - Patna ckt - 3, 400 kV Barh - Patna ckt - 4, 400kV Kishanganj Saharsa 1 and 2, 400kV Ranchi- Rourkela 1, 400kV Ranchi- Rourkela 2, 400kV Ranchi- Dhanbad 1, 400kV Ranchi- Dhanbad 2, 400kV Ranchi- Sipat 1, 400kV Ranchi- Sipat 2, 400kV Ranchi- Maithon 1, 400kV Ranchi- Raghunathpur 1, 400kV Jamshedpur - Baripada, 400kV Jamshedpur - TISCO, 400kV TISCO - Baripada Line, 400kV Gaya - Maithon ckt - 2
Annual Operation maintenance work of Saraikela Urban Water Supply Scheme consisting of main feature such as operation and maintenance of 5 MLD WTP Daily Average supply 2 7 MLD near Saraikela Division Office and Intake well situated at Kharkai
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Kukru Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Ichagarh Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Nimdih Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Chandil Block of D W S Sub Division Chandil
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Kuchai Block of D W S Sub Division kharswan
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Kharswan Block of D W S Sub Division Kharswan
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Gamhariya Block of D W S Sub Division Saraikela
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Rajnager Block of D W S Sub Division Saraikela
Name of Work Changing of Rotton Riser Pipe Connecting Rod of drilled tube well India Mark with 32 mm dia medium class riser pipe and 1 3 Cylinder including supplying of materials labours in Saraikela Block of D W S Sub Division Saraikela
Construction of PCC Road from main Road to Kasturba Gandhi Balika Vidyalaya Saraikela Block Saraikela Dist Saraikela Kharsawan
Truck Mounted Road Sweeper (Q2)
RWD/EE/SRK/24/ 2024-25 Construction of Road From PCC Road in Complete Aruwan Village (L- 2.820 Km.)
Construction of Health Sub Center at Village Sindurpur under Kukdu Block, Dist-Seraikella Kharsawan
Preventive, Periodic and breakdown maintenance work at 132/33 kV GSS, Adityapur-I for the period from 01.06.2026 to 31.03.2027 (for 10 months)
Annual maintenance work including periodic and preventive maintenance work including periodic and preventive maintenance of equipment at 132/33 kV GSS, Chandil-II (Manikui) for the period from 01.06.2026 to 31.03.2027 (for 10 months)
Annual maintenance work including periodic and preventive maintenance of equipments at 220/132 kV GSS, Chandil-I for the period from 01.06.2026 to 31.03.2027 (for 10 months)
Outsourcing of mandays (ITI Trained and Un-Skilled Khalashi) for operation work at 220/132 kV and 132/33 kV Grid Sub-Stations under Transmission Circle, Jamshedpur on shift duty for the period from 01.06.2026 to 31.03.2027
Annual maintenance work including periodic and preventive maintenance of equipments and testing of grid equipments as per standard operating procedure at 220/132 kV GSS, Adityapur-II (RCP) for the period from 01.06.2026 to 31.03.2027 (for 10 months)
Preventive, Periodic and breakdown maintenance work at 132/33 kV GSS, Adityapur-III (RCP) for the period from 01.06.2026 to 31.03.2027 (for 10 months)
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Construction of PCC Road From Opposite of SAMUDAYIK BHAWAN to 177 meters towards SHIV MANDIR IN Ward No. 12 Under AMC
Supplying of Spare Parts of India Mark deep well hand pump conforming to IS9301 990 with latest amendment (may be read along with 1st amendment to IS 15500 Part 1 8 2004 along with latest amendment for spare parts in saraikela Division
Construction of Health Sub Centre Building at West Bagbera of Jugsalai-cum-Golmuri Block.
Curtains (V2) (Q3)
shield wire earthing materials for installation in Transmission Line
A4 Color Multi-Function Printer