Repair, painting, water proofing, furniture and electrical relateworks of Dhom Canals Division No.2, Dhom Left Bank Canal SubDivision No.7, No.4 and Kanher Rehabilitation and Land Acquision SubDivision Satara,Sinchan Bhavan Premises as well as Krus
Repairs 2 Classrooms building of Zilla Parishad Prathamik School at Shenwadi Tan Man
Construction of Regional Workshop For Mechanical Division and Doing Other Related Works
Construction of Parking shed and Diesel Supply Shed For SubDivision and Regional Workshop Under Mechanical Division Satara
Creation of An Archive Room to Preserve Records Under Krushnanagar Colony.
Rehabilitation and Disaster Mitigation works for Kisrule Village at Patan .Tal- Patan Dist-Satara.
Construction of toilets for Employees of Quality Control SubDivision, Satara, Dhom Left Bank Canal SubDivision No.4 Satara and Kanher Land Acquisition and Rehabilitation SubDivision, Satara offices
Rehabilitation and Disaster Mitigation works for Gokul terf Helwak Village at Patan .Tal- Patan Dist-Satara.
Development of namo udyan near parsi point
. improvment of mayni mhaswad road shelkewasti vr no 190 .ch 0/00 to 1/00 km
Supply of all in one computers, workstations and Microsoft Office 2024
Construction of Seven Room Primary School Building (slab) at Khandala,Tal- Khandala
Balance civil work of constructing New gated Bandhara across river Krishna near village Khodashi Tal Karad Dist Satara
PROPOSED PLASTIC COLLECTION AND PROCESSING UNIT AT VARNE TAL AND DIST-SATARA
Conducting Prelimi Survey investigation Design and Preparing Estimate of cadwm work on Command of Man Khatav lift Irrigation scheme and Kamath Gravity Main offtaking from Kamath Storage Tank Tal Man Khatav of Dist Satara Tal Atpadi of Dist Sangl
a. Providing, Installing, Testing an Commissioning of Water lubricated Vertical Turbine Pumpset, 300 H. P. V.H. S. Motor, Panel starter Old Jackwell. b.Providing, Installing, Testing and Commissioning 300 Sq. mm Aluminium armoured cable c.Deslting o
To provide manpower through an external agency as per requirement for Rahimatpur Municipal Council
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
REPAIRS WORK TO Z P PRIMARY SCHOOL BULIDING 3 ROOMS AT kaswand TAL MHABALESHWAR DIST SATARA
CONSTRUCTION OF FOUR ROOM SCHOOL BUILDING AT ZP PRIMARY SCHOOL LHASURNE FIRST FLOOR TAL KOREGAON DIST SATARA
Improvement of N.H.-4 Limb -Gove Vangale Arphal to S.H.117 Road-O.D.R 62-Ch.3/0 to 6/500 Tal Dist.-Satara
IMPROVEMENT TO ROAD PHALTAN SASTEWADI KAMBALESHWAR KAVATECHA MALA ROUTE SHINDEWADI ODR-16 TAL-PHALTAN CH -5/00 TO 6/500
WBM and STBT to Malkapur Nagarparishad Owned Land at NH-4 D-mart to Bharati Vidyapeeth At Malkapur, Tal -Karad, Dist-Satara
T-Shirt (V3) (Q3)
1. Proposed Work Of Patch Work on Palkhi Route At Lonand
REPAIRS TO STAFF QUARTER AND M.O. QUARTER BUILDING.PHC AT-KUSUMBI TAL-JAOLI DIST-SATARA
Construction of Gravity main and closed pipe distribution system from pressure release tank for Bhadale Valley Gravity main under Guruvarya late Laxmanraoji Inamdar Lift Irrigation scheme, (Jihe Kathapur), Dist. Satara.
COMPRSR CNG EMD 600SCMH, INST TEST COMM 600SCMH EMD, 1st yr PWCAMC 600SCMH EMD at 9.25 prcnt, 2nd yr PWCAMC 600SCMH EMD at 10 prcnt, 3rd yr PWCAMC 600SCMH EMD at 10.75 prcnt, 4th yr PWCAMC 600SCMH EMD at 11.50 prcnt, Opn 1styr GED600SCMH EMD at 15 prcnt, Opn 2ndtyr GED600SCMH EMD at 15.75 prcnt, Opn 3rdyr GED600SCMH EMD at 16.50 prcnt, Opn 4thyr GED600SCMH EMD at 17.25 prcnt, Opn 5thyr GED600SCMH EMD at 18prcnt, COMPRSR CNG CBG GED 600SCMH, INST TEST COMM 600SCMH GED, 1st yr PWCAMC 600SCMH GED at 7.5 prcnt, 2nd yr PWCAMC 600SCMH GED at 8 prcnt, 3rd yr PWCAMC 600SCMH GED at 8.5 prcnt, 4th yr PWCAMC 600SCMH GED at 9 prcnt, Opn 1styr GED600SCMH GED at 10.5 prcnt, Opn 2ndtyr GED600SCMH GED at 11 prcnt, Opn 3rdyr GED600SCMH GED at 11.5 prcnt, Opn 4thyr GED600SCMH GED at 12 prcnt, Opn 5thyr GED600SCMH GED at 12.5 prcnt
Construction of sabhamandap at Male Kolane, Tal.-Patan, Dist.- Satara
APPOINTMENT OF CONSULTANT FORNEW ADMINISTRATIVE BUILDING FOR PANCHAYAT SAMITI - KHATAV, TAL.- KHATAV(VADUJ), DIST. - SATARA(MAHARASHTRA)
PROVIDING AND LAYING RCC PIPE LINE BOTH SIDE FOR DRAIN AT SAT SHAHID CHOWK TO SANT TUKARAM HIGHSCHOOL, KARAD
Wakhan Road Ashok Vihar Ranjit Nagar Construction of RCC Pipe Gutter.
Construction of Inlet Chamber and Valve Chamber for pipe Distribution network on Urmodi Right bank canal
Construction of Samarthgaon, Kashil Lift Irrigation Scheme Civil Works, Electrical Works And Mechanical Works Under Urmodi Irrigation Project
Construction of Lawanghar Lift Irrigation Scheme Civil Works, Electrical Works And Mechanical Works Under Urmodi Irrigation Project
Providing Remedial Measures for Land Slide Prone Areas At Nakinda, Tal- Mahabaleshwar, Dist-Satara.
Providing Remedial Measures for Land Slide Prone Areas At Avakali, Tal- Mahabaleshwar, Dist-Satara.
Construction of Sakav On Nalla across road at Watole. Taluka -Patan Dist. Satara
WAI INDUSTRIAL AREA M and R to WSS in Wai Industrial Area Construction of Gabion Wall and Repairs to Compound Wall at Menavali Jackwell
Construction of PWS Scheme at Apti Tal. Jaoli, Dist- Satara
Retrofitting to PWS Scheme at Ker, Tal. Patan, Dist. Satara
Construction of PWS Scheme at Nipani, Tal. Jaoli, Dist- Satara
Estimate No.131355, 58,60 and 61 of 2025-2026 S.I.T.C. of CCTV Surveillance System in BC Boys Hostel Premises, BC Girls Hostel Premises,Samaj Kalyan Office and District Caste Validity Office at Satara Tal.and Dist Satara
Construction of Diversion Weir, And Distribution System At Gram-Maneri , Tal-Patan, Dist-Satara
CONSTRUCTION OF GOVERNMENT QUARTERS FOR SABHAPATI AT PANCHAYAT SAMITI KHATAV TAL-KHATAVA,DIST-SATARA
Annual Maintanance to S.H.140 to Kodoli Degaon Nigadi Varne Road MDR 28 Km 0/00 to 14/020, Tal and Dist-Satara...
One year maintanance to Kinhai Hivare Bhadale Bodhewadi Nagewadi Chilewadi Hasewadi Dhangarwadi Bhadale Road MDR-161 Km 0/000 to 22/000 Tal-Koregaon Dist-Satara.
Supply of India Mark - II Hand Pump Set for Borewells
66-2 - S.R. to Annual Maintenance for Rajbhavan at Mahabaleshwar Dist. Satara Premices. (For Year 2025-2026)
Construction of Processing Shed 120.00 SQM