Loading…
Loading…
56 results • Latest
SH patch soling patch WBM carpeting seal coat pucca drain and other allied works portion from ch. 3.60 km to Ch. 4.125 km
SH WBM3 GSB grouting Carpeting Seal coatPaver Block etc
SH patch soling patch WBM carpeting seal coat pucca drain and other allied works portion from ch. 2.500 km to Ch. 3.035 km
SH Patch Grouting, Patch Carpeting with sand seal coat Pucca drain Pucca drain clearance and other allied works
SH WBM paver block pucca drain cc block toe wall and other allied works portion from ch. 1.05 km to Ch. 1.20 km
Development of road from Sonamura Melaghar road (near Sanjit Kar house) to Abdul Barek house (L 150 m) under the jurisdiction of Sonamura Sub Division PWD (RandB) during the year 2026 2027 SH Earth filling GSB Paver Block
Maintenance of steel foot bridge over Gomati River at Telkajla G.P under Mohanbhog R.D Block during the FY 2026-27 (PWD SoR 2023).
Grouting, carpeting, tack coat, seal coat surface drain
Development of road Sonamura Boxanagar road to Paschimpara (L 0.701 Km) during the year 2026 27 SH construction of pucca drain WBM carpeting seal coat paver block etc and other allied works portion from Ch 0.00 km to Ch. 0.236 km
Patch soling, grouting, carpeting, tack coat, seal caot