Loading…
Loading…
37 results • Latest
Inverter split air conditioner, Voltage Stablier, Socket with MCB, Copper Tube, Wall mount kit
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Long Term Output and Performance based Road Assets Maintenance works under Package 33A/OPRMC-III/Sheikhpura
Estimate For Construction of 125 mm dia , 55 Mtr Deep gravel packed tubewell ( 35 Nos) and construction of 125 mm / 115 mm x 60 M deep drilled tube well ( 04 Nos) with India mark-II handpump with platform and drain as per UNICEF design and Construction of Soakpit (46 Nos) in place of old defunct handpump in the water scarce rural areas of Sheikhpura District under P.H.Division Sheikhpura for the year 2026-27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - GP BHANPUR; SUPPLY & INSTALLATION OF LIBRARY FURNITURES & BOOKS; SELLER
Interactive Panelswith CPU (Q2)
Tender for Furniture IT,, Electrical & Education item
Construction of Office-cum-Residence (OCR) Complex at Sheikhpura. SH- Soil investigation and Digital Topographical Survey (SSP)
Cooled Radiofrequncy Treatment Electrodes for Joint Pain Relief (as per attached specification)
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Potable Water Purification System DE-Ionization Based (Q3)
Comprehensive operation and maintenance and Special repair of Ward level Piped Water Supply Schemes based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bill for thirteen month Under P.H Div sheikhpura-2026-27
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
Construction Of 100 Bedded Savitribai Phule Girl's Hostel Dist.Shekhpura
Beautification of Bengali Pokhar under Nagar Parishad Sheikhpura.
Electrical and
Civil and Mechanical Lab
BSO ENGG-Development of A site RO Between Hatia Chowk Barbigha and Keoti police station on NH 82 in Sheikhupura District under Begusarai South RSA under Begusarai DO,Bihar State Office
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Admin
Tanker on Agricultural Trailer (Q2) (3 (3 ))
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
Estimate For Construction of 125 mm dia , 55 Mtr Deep gravel packed tubewell ( 37 Nos) and construction of 125 mm / 115 mm x 60 M deep drilled tube well ( 09 Nos) with India mark-II handpump with platform and drain as per UNICEF design and Construction of Soakpit (46 Nos) in place of old defunct handpump in the water scarce rural areas of Sheikhpura District under P.H.Division Sheikhpura for the year 2025-26
COOLED RADIO FREQUENCY TREATMENT ELECTRODE FOR JOINT PAIN RELIEF
Desk and Bench Set for Classroom/Training Area (Q2) (3 (3 ))
Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Leg Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7111790 Dated : 14-01-2026 Bid Document 1/19, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Twister - Outdoor Gym Equipment Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of 100 Bedded SC-ST Boys Hostel Barbigha At Shekhpura
Chair for General Purpose (Q2) ( PAC Only ), Revolving Chair (V5) (Q2) ( PAC Only ), Executive Table (V4) (Q2) ( PAC Only ), Steel Almirah/Cabinets (V4) (Q3) ( PAC Only ) (3 (3 ))