Loading…
Loading…
97 results • Latest
Bundal Khul-Construction of lining wall and bed treatment on both sides of Khul branch of Saingaloo at village Kundalan
Lar canal- Construction of RCC box culvert and wing walls at RD 800 M on Asthan Ladi branch of lar canal for diversion of Flood Nallah and construction of lining wall on both sides from RD 2500 M to RD 2521 M
Palkha Khul-Construction of lining wall on Khul branch of Saingaloo canal at village Malik Gund from RD 0 to RD 315 M Phase-I.
CREATION OF 63 KVA SUB STATIONS ALONG WITH HT LT NETWORK AT NEW COLONY ALAMGUNJ AND CHALLA MOHALLA BONPORA D.K.PORA UNDER UT CAPEX 2026
CREATION OF 63 KVA SUB STATION ALONG WITH HT/LT NETWORK AT Malik Mohalla Nagisheran Bala AND Augmentation of 25 KVA by 63 KVA Sub Station Shalidora Astanpora under CAPEX 2026-27
UPGRADATION OF INSPECTION HUT AT DONGIMARG PEER KI GALI HIRPORA WLS
CBC KIT, TROPOLIN, TG KIT, BLOOD CHESTROL KIT, UREA KIT, CREATININE KIT, WIDAL KIT, TYPHIODOT KIT, EDTA TUBE