Tender Value
₹9.3 L
EMD Value
₹18,570
Closing Date
2 Sept 2026, 2:00 pm5d left
Ex. Engineer R and B Division Shopian
Shopian
Construction of Boundary Wall at High School Pahnoo
2026_PWDJK_321479_2
44/4731-41/RnB/SPN/e-tender of 19-08-2026
Open Tender
Civil Works
Percentage
20 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Bearing No 0470010200000099
₹18,570
19 Aug 2026
19 Aug 2026
3 Sept 2026
20 Aug 2026
2 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Felling trees of the girth Beyond 30 cm girth upto and including 60 cm girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable as per direction of Engineer-in-charge | - | Nos | 0.6 | - |
| 2 | Felling trees of the girth Beyond 60 cm girth upto and including 120 cm girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable as per direction of Engineer-in-charge | - | Nos | 0.8 | - |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming All kinds of soil : | 1 | Cum | 0.8 | ₹0.8 |
| 4 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete | - | Cum | 0.8 | - |
| 5 | Providing and laying in position cement concrete 1:4:8 (1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete | - | Cum | 0.2 | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages complete | - | Cum | 0.4 | - |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | - | Kgs | 0.8 | - |
| 8 | Providing and laying in position cement concrete in 1:2:4 (1 Cement: 2 Corase sand: 4 grade stone aggr 20 mm nominal size crushed) including curing but excluding the cost of centring and shuttering all work upto plinth level and above plinth level upto required height including all carriages complete | 1 | Cum | 0.6 | ₹0.6 |
| 9 | Brick work with common burnt clay bricks of class designation 7.5 in Super structure above plinth level upto floor V level in Cement mortar 1:6 ( 1 cement : 6 fine sand) including loading unloading etc including all carriages complete | 1 | Cum | 0.8 | ₹0.8 |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate)/Coping finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate including all carriages complete | - | Sqm | 0.2 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1073894.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].