Loading…
Loading…
501 results • Latest
BULK PROCUREMENT OF 43 inch TV
Annual Maintenance Contract (AMC) for complete lubrication system of 24 96 Saurav and Gaurav Dragline working at Bina Project
Annual Maintenance Contract of 02 number 25kW Industrial Air Conditioner Installed in 24 96 Draglines Saurav and Gaurav of Bina Project for 02 years. (Work to be carried out at NCL site).
Construction of Elevated Road and Corridor for Ash Pipe Line of Anpara Thermal Power at Belwadah
NER-LJN Division:- Provision of P.P. Shelter at 12 nos of different stations. (MOTG PF-2- 01 bay, JLHI PF-2- 01 bay, LKNR PF-2-01 bay, PATI-PF-2- 01 bay, TH-PF-1-01 bay, GOVR-PF-1-01 bay, ORW-PF-1&2-01 bay at each PF, MND-PF-1&2-01 bay at each PF, CRV-PF-1&2-01 bay at each PF, JTB-PF-1&2-01 bay at each PF, CLJ-PF-4- 01 bay & GDK-PF-2/3-02 bays & PF-4-01 bay, Total (18 bays)
Head End Shaft for SSC 170 mm, Return trough idler shaft for SSC 100 mm, Roller for the Tail End shaft of SSC, ID: 100 mm, Locking Collar with Grub Screw, Complete Guide Wheel Assembly