Loading…
Loading…
514 results • Latest
Annual Maintenance Contract of 02 number 25kW Industrial Air Conditioner Installed in 24 96 Draglines Saurav and Gaurav of Bina Project for 02 years. (Work to be carried out at NCL site).
Construction of Elevated Road and Corridor for Ash Pipe Line of Anpara Thermal Power at Belwadah
NER-LJN Division:- Provision of P.P. Shelter at 12 nos of different stations. (MOTG PF-2- 01 bay, JLHI PF-2- 01 bay, LKNR PF-2-01 bay, PATI-PF-2- 01 bay, TH-PF-1-01 bay, GOVR-PF-1-01 bay, ORW-PF-1&2-01 bay at each PF, MND-PF-1&2-01 bay at each PF, CRV-PF-1&2-01 bay at each PF, JTB-PF-1&2-01 bay at each PF, CLJ-PF-4- 01 bay & GDK-PF-2/3-02 bays & PF-4-01 bay, Total (18 bays)
Head End Shaft for SSC 170 mm, Return trough idler shaft for SSC 100 mm, Roller for the Tail End shaft of SSC, ID: 100 mm, Locking Collar with Grub Screw, Complete Guide Wheel Assembly
HE Rotor Post Seal (3021-01) for Primary APH 26-VIX-1625, HE RADIAL SEAL OUT (3021-04) STY-1, Seals for Primary APH, HE Outer Sealing Tab (3021-8) for Primary APH 26-VIX- 1625, HE Axial Seal 3021-12 Style-1 for Primary APH 26-VIX- 1625, CE Radial Seal Inner (3021-20) STY-1 for Primary APH 26-VIX-1625
Tubular protector for Spacer Tube, Size: L 1000mm, Tubular protector for Tertiary S.H. tube, ID-57mm, U Clamp of Size: ID-53mm, Width 40mm, Th. 4.0mm, Tubular protector for Pri. S.H. tube, Size: L 1500mm, ID-45mm, Reverse 90 deg bend Ash Protector for Primary SH horizontal Size: ID-45.5 mm