Loading…
Loading…
3,109 results • Latest
Earth work and Pucca work at various chainage in Right Pandu Basin Canal from km. 10.450 to km. 15.250 off-Taking from parent Channel R.K.C.
Construction of Pucca structures and E/w for construction of canal at various reaches between km. 15.500 to km. 27.500 of Left Pandu Basin Canal.
Construction of Pucca Structures and E/w for construction of canal at various reaches in between km. 0.450 to km. 14.650 of Left Pandu Basin Canal.
Overhauling of Air Ventilation System (06 nos.) and Air Exhaust System (04 nos.) and dust extraction (03 nos.) system with complete dismantling, re-installation and commissioning at Ph-1 and 2 Crusher House installed at CHP Dudhichua
Annual Maintenance Contract (AMC) for Shifting, Erection, and Dismantling of HT Overhead Line at West and Coal Sections of Dudhichua Project for a Period of 02 Years (730 Days)
Tablet Computer (V2) (Q2) (3 (3 ))