Loading…
Loading…
6 results • Latest
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Foam Making Branch-FB10X (Jet) with Inline Inductorasper IS2097: 2012 (Latest Amendment) (Q2)
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Sr.DEN/North/SBC sec: SW-I: Proposed Construction of pedestrian Subway at Km. 96/400-500 between Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-II: Proposed Construction of pedestrian Subway at Km. 96/700-800 between Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-III: Proposed Construction of pedestrian Subway at Km.97/000-100 between Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-IV: Proposed Construction of pedestrian Subway at Km.161/200-400 between Makkajipalli - Nagasamudram Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =29.00m) under ADEN/Hindupur Sub-Division. SW-V: Proposed Construction of pedestrian Subway at Km.22/900-23/100 between Sri Sathya Sai Prashanthi Nilayam - Basampalle Stations, by rolling and launching method. Size:1x5.00x3.15m (Barrel length =22.00m) under ADEN/Hindupur Sub-Division. Maintenance period is 4 years
Providing of Road safety Interventions for the Accident Locations at Km 181/0-8 Km 185/300 - 186/100, Km189/8 - 190/00, Km 196/0-8 and Km198/6-199/400 of Kadiri- Mulakalacheruvu Section NH-42 in Sri Sathya Sai District