Loading…
Loading…
14 live10 closing this weekmost from MUNICIPAL ADMINISTRATION DEPARTMENT and Central Silk Board
14 results • Latest
Allin One PC (V2) (Q2)
Construction of HLB in KM 82/2-6 of Kadiri- Hindupur road in Sri Satya Sai District (5 Vents of 10m effective span with foot path)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) 3 3
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( ( 3 3 ))
Supply and fixing Precast Compound Wall & Iron Gate for Hindu Burial Ground 3rd Ward in Puttaparthy Municipality Under General Funds
Hiring of Water Tankers for Drinking Water Supply and Maintenance of Drip System Greenery along Municipal Roads in Puttaparthi Municipality Under General Fund
Drilling of New Bore well including supply od 10 H.P Submersible Motor, Pump Set,Service wire,50 MM dia GI Pipe etc., in the 15TH Ward,Puttaparthy Municipality Under Municipal General Funds
Manufacture, Supply, Delivery and Installation of 1,040 Aerobic In-Vessel Composter Kits of various capacities at 505 Government Residential Institutions/Hostels in the districts of Guntur, Palnadu, Bapatla, Prakasam, Markapuram, SPS Nellore, Tirupati, Chittoor, YSR Kadapa, Annamayya, Anantapur, Sri Sathya Sai, Kurnool and Nandyal in the State of Andhra Pradesh under SBM(G). (2nd call)
Laying of 450mm CC Drain From D.no: 5 145 1 to 5/145-67A at Thummala Tank Road election ward no 20 in kadiri Municipality
Laying of 1000mm CC Drain From Shri Lakshmi Narasimha Swamy Temple to Hindupur Road at 27th election ward in Kadiri Municipality.
Upgradation of existing SCHNEIDER SAS
Supply, Erection, Testing and Commissioning of 220/33kV Features at 220/132KV SS Pampanurthanda (Bhanukota Village) for Integration of 225MW (450MWh) BESS in Sri Sathya Sai District.
Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Maintenance of 45.6 MW ISTS Connected Wind Power Project at Ramagiri, Sri Sathya Sai District, Andhra Pradesh (Packge-2: Wind)