Loading…
Loading…
84 results • Latest
Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 2500 km x 320 hours; Local 24*7
Hiring of Sanitation Service - Manpower Based Model - Sweeper; 6; All Areas; All Areas; Daily; 2, Hiring of Sanitation Service - Manpower Based Model - Sanitation Officer; 6; All Areas; All Areas; Daily; 2
Improvements to the road Kanaganipalli Chiguruchettu from Km 24/5 - 28/0, 29/0 - 35/2, 36/4 - 39/2 in Sri Satya Sai District
Providing bore well, Motor pump set , construction of Water Sump, and Hand railing for Control House etc works at existing 132/33KV Switching Sub-station , Beechiganiapalli in Sri Satya Sai District
Annual Maintenance and day to day to up keepin of NACIN Campus, Palasamudra, Sri Satya Sai District, Andhra Pradesh for the year 2026-27 Sub Head: Providing, laying and fixing horticultural water supply lines at the outdoor clay courts, security cabin, banayan tree near temple, Guest House club house rear side & pond surrouning, and RO plant shed executing works at the Type-III quarters, dispensary, and officers mess terrace laying an additional water suply line from the Type-III quarters to the CPWD office and an HDPE line to the Miyawaki garden connecting the water supply to the open well near STP-02 replacing main entrance gate no. 01 and the inaugral place Inorganic shed works, Banana tree artificial grass shade, and carrying out other miscellaneous preparatory work.
1Silicon Insulation sleeve for ACSR Moose conductor, 2Silicon Insulation sleeve for ACSR Bersimis conductor, 3Self Fusing tape 2.5 inch width 0.76mm thickness Roll Length- 11 mtr. For Conductor.
Urgent Repairs to the High Level Bridge at Km 22/2 of Penukonda - Madakasira road in Sri Sathya Sai District.
Annual maintenance of ZP taken over roads in (R&B) Section-II, Madakasira in Sri Sathya Sai District for the year 2026-27.
Improvements to the road Agali to Jammulabanda (via) Ramanahalli, Rolla Mandalahalli and Gudibanda from Km 18/2 to 18/6, 19/4 to 19/5, 21/2 to 21/4 in Sri Sathya Sai District.
Repair of maintenance of sanitation vehicle No: AP07 K 6990, AP 07 T 3367, AP02 V 2023 in Hindupur Municipality under General funds 2025-26 (1st Call)
Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping; Unskilled, Facility Management Service- Manpower based (Version 2) - Commercial; Data Entry Operator; Skilled
Providing CC road from Anjaneyulu house to Narasimhulu House NTR Colony Penukonda
Providing CC Road from Thippanna (SC) House to Chakali Sivappa House NTR Colony Penukonda
APSPCL - AUMSP - Laying of Pre-Caste RCC Cover Blocks for Closing of Trenches in Pooling Stations of AUMSP Park, Sri Satya Sai district, A.P.
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Annual maintenance of MDR and OD roads in (R&B) Section, Penukonda in Sri Sathya Sai District for the year 2026-27. (2nd Call)
Short Term Cab & Taxi Hiring Services - Sedan; Outstation; 300Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - Premium Sedan; Outstation; 300Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - SUV; Outstation; 300Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; 300Kms x 10Hrs, Bus Hiring Service - Short Term - Outstation; 9-12; A.C. Deluxe (ACX), Deluxe (DLX), Semi Deluxe (SDX), Non Deluxe (NDX); 300
Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 2500 km x 320 hours; Local 24*7
Construction of pipe culvet to crossing the surplus course of Ubicherla tank, Ubicherla Village, Nallacheruvu Mandal of Sri Sathya Sai District
Construction of Side wall at vulnerable reaches of Diguvacheruvu Supply Channel near Kalasamudram (V) in Kadiri (M) of Sri Sathya Sai District
Construction of pipe culvert to crossing the surplus course of china cheruvu, Cheruvuvandla palli Village, Nallacheruvu Mandal of Sri Sathya Sai District
Improvements to Rangappa Kunta near Beedupalli (V) in Puttaparthy (M) of Sri Sathya Sai District
Repairs to Existing Aqueduct across Muthyalacheruvu Surplus Stream near Muthyalacheruvu (V) in Kadiri (M) of Sri Sathya Sai District
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Outstation, Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 2000 km x 320 hours; Outstation
Major and Minor Repairs to MJPAPBCWRSC for Boys at Kadiri (V&M) in Sri Satya Sai District - Estimate Cost of Rs. 54.20 Lakhs
Construction of shopping complex at Sub-Jail Compound in Dharmavaram, Sri Satya Sai District (2nd Call)
Improvements to the road Amarapuram - Madhudi road from Km 18/0 to 24/2 in Sri Satya Sai District.
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Highly-Skilled; Graduate; Others
CONSTRUCTION OF KITCHEN SHED TO APTWR (G) SCHOOL AT THANAKAL (V&M) IN SRI SATYA SAI DISTRICT (C/O OF NEW SEPTIC TANK, CC DRAINAGE, MAJOR & MINOR REPAIRS TO APTWR(G) SCHOOL AT THANAKAL (V&M))
Engagement of highly skilled fitters for cleaning of porcelain
Construction of a. 450 mm CC Drain from Pole No.63/56 to D.No.5-6-564 b. 300mm CC Drain from D.No.5-6-708 to 5-6-564 c. 450mm CC Drain from Pole No.68/35 to 68/33 Drains d. 300mm CC Drain from Pole No.68/33 to D.No.5-6-596 e. 300mm CC Drain from Pole No.127/18 to 127/14 f. 450mm Culvert near Pedha Masjid g. Culvert near Pole No.63/56 h. Culvert near D.No.5-6-708 in Model Colony, Ward No.11 (1st Call)
Laying of CC Roads from a. Bhageeratha circle to Shivalayam temple road b. Pole No.SS0/180 to Hanumantharayappa house c. Pole No.23/18 to 23/17 d. Pole No.23/13 to 23/15 e. Pole No.23/12 to 23/10 f. Pole No.23/1 to 23/9 in Auto Nagar, Ward No.13 (1st Call)
Laying of CC Road from a) DNo:27-8-800/1 to D.No:27-8-816-1A b) DNo:26-3-452 to D.No:27-8-816-9A1 c) D.No:27-8-816-1A to D.No:27-8-816-9B2 in Venkateswara Colony ward No 35 (1st Call)
Laying of CC Road from a) DNo:26-3-474 to D.No:26-3-506 b) Opp Chowdeswari Kalyanamandapam to Behind Ravi Silks c) D.No 27/8/1001/1 to 26-3-35-2 d) D.NO 26-3-8-31 to 26-3-8-58-8 in ward No 34 (1st Call)
Laying of CC Road from a) D.No.27-8-1339/2 to d.No.27-8-781-7 b) D.No.27-8-87 to D.No.27-8-41/1 and from c) D.NO 27/8/789 to 27/8/80 in Mudireddypalli ward No 38 (1st Call)
Repairs to MJPAPBCWRS Junior College for Girls at Tekulodu (V) Chilamathur (M) in Sri Sathya Sai Dist Est.Cost Rs.39.30Lakhs. (2nd Call)
Supply installation commissioning of MultiFunction Printers
Construction of a. 450 mm CC Drain from D.No.5-6-860 to Pole.No.97/12 b. 450mm CC Drain from Pole.No.97/67 via Water Plant to Pole.No.63/51 Drains c. Culvert near Pole No.99/27 d. Culvert near Pole No.68/61 e. Culvert near Pole No.97/67 f. Culvert near Water Plant g. Culvert near Pole No.63/51 in Model Colony, Ward No.12 (1st call)
Construction of CC Drain and Culvert near School (Pole No.10/7 to 10/9), in Ward No.13 ( 1st Call)
Laying of CC Road from EP No.155/31 to 110/12, in Nallappa Layout, Ward No.7 (1st Call)
Laying of CC Road from a) DNo:27-5-27 to D.No:27-5-291-A b) D,no 26-1-128/1 to 26-1-131/4 in Singireddypalli ward No 38 (1st Call)
Laying of CC Roads froma. D.No.125 to 104 b. Pole No.68 to 67 c. Pole No.65 to 66 d. Pole No.64 to 6 e. Pole No.13/14 to 13/20 Roads f. Pole No.13/10 to 13/11 g. Venu house to Plot No.902 h. Tirupala house to Lakshmamma Plot No.13 in Indiramma Ward No.1 (1st Call)
Laying of CC Roads from a. D.No.12-7-76/40-1 to 21-8-260/3 (Sri Shanti Nivas) b. D.No.12-1-76/7b to 12-1-76/7a Opposite to RK Function Hall, in Bengaluru Road, Ward No.17 (1st Call)
Laying of CC Roads from a. Pole No.23/2 to 23/6 b.Pole no.23/3 to 23/5 c. Opposite 1st cross to Siddappa house (D.No.166) d. D.No.10/9 to 21-9-407/1 in Auto Nagar, Ward No.13 (1st Call)
Laying of CC Road from DNo:27-1100/8 to D.No:27-1011/4 in Dwaraka Colony Ward No 35 (1st Call)
Annual maintenance of ZP taken over roads in (R&B) Section, Amarapuram in Sri Sathya Sai District for the year 2026-27.
Urgent Repairs to Km 2/8, 5/8, 6/4, 8/2, 8/4 and 9/6 of Madakasira - Amarapuramu road in Sri Sathya Sai District.
Annual maintenance of Major District Roads in (R&B) Section-I, Madakasira in Sri Sathya Sai District for the year 2026-27 .
Annual maintenance of ZP taken over roads in (R&B) Section-I, Madakasira in Sri Sathya Sai District for the year 2026-27.
Construction of Revenue Divisional office building at Madakasira Est. cost Rs.120.00 Lakhs