Loading…
Loading…
1,409 results • Latest
BOQ
BOQ
Galvanized Steel Chain Link Fence Fabric (V2) conformingto IS2721 (Q3)
Pahalwanpur link road
Laptop 15 inch with Mac OS 2026
1447000889 Indexable end mill cutter dia-32mm, steel shank dia-32mm, ssuitable for carbide milling i, 4100401615 ISO milling insert XDPT110408 pdsrmu- WU20PM, no of cutting– EDGE MIN. 02, insert length-1
Construction of RCC covered drain between Ch. 216.500 to 217.795 (LHS) at Ahimamau and Ch. 204.505 to 204.750 (RHS) at Gosaiganj total length of 1.54 km on Sultanpur to Lucknow Section of NH-731
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at Jaisinghpur, Distt. Sultanpur (U.P.)
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at Kurwar, Distt. Sultanpur (U.P.)
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at Dostpur, Distt. Sultanpur (U.P.)
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at Akhandnagar, Distt. Sultanpur (U.P.)
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at Dhanpatganj, Distt. Sultanpur (U.P.)
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at PP Kamaicha, Distt. Sultanpur (U.P.)
Trichloroethylene
Air Break Contactors (Q3)
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
Construction of Computer Lab in the Campus of Kasturba Gandhi Balika Vidyalaya at Lambhua, Distt. Sultanpur (U.P.)
Machining 14 lines components with HAL material
Stable Bleaching Powder for Household and Industrial use (V3) conforming to IS 1065 (Part 1) (Q3)
Temephos Granules 1% (Q3)
Electronic Weigh Bridge (Without Civil Work) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Electrostatic Discharge Chairs (V2) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Maintenance Works and Deployment of Manpower for O and M of various400KV 220 KV and 132 KV Substations under ETC Sultanpur; Substation, Switchyard; Service Provider
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Waste Container (V3) (Q4)
BOQ
BOQ
BOQ
Batau Ka Purwa Dewalpur link road
Pole Mounted Stainless Steel Dustbin (V2) (Q3)
Construction of CM Model Composite School at Village- Jafarpur Block-Kurebhar Distt. Sultanpur
Samhutakala link road
BOQ
BOQ
Work of new bridge of 3x5 m span in place of damaged bridge at km0 of Bharkhare to alipur
Bisanwa link road