Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
838 results • Latest
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Trade shows and expos; Complete Execution of Activity; 1000; Buyer premise
LPP 2666 Flowserve make Mechanical Seals for Boiler feed
Supply of Scraper Bar for Scraper Chain Conveyor System for AHP# 6 at GSECL Ukai TPS.
Grain Storage Bin (Q3)
LP(P) -2681 TECHO-GENERATOR FOR EEDDY CURRENT CLUTCH DRIVE SUITABLE
LP(P) -2586: HIGH EFFICIENCY LINE FILTER INSERTS SUITABLE FOR SULZER 32 VB FILTER UNIT ( 5 the number pi ), HIGH EFFICIENCY LINE FILTER INSERTS SUITABLE FOR SULZER 32 VB FILTER UNIT, PART NO: HC9600FKP4H ( 4 the number pi )
LP(P) -2689: MAX DNA MAKE SINGLE CHANNEL SPEED MONITOR
LP(P) -2715: INCREMENTAL ENCODER, SPRING STEEL COUPLING
Dew Point Meter (Q3)
SPARE PARTS OF VAM CHILLER
Reinforced EPDM rubber Diaphragm for pneumatically operated valve actuator as per specification.
Solar Photovoltaic Water Pumping Systems (V2) asper MNRESpecification (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-118G Work Contract for Monthly servicing, calibration verification and annual stamping of 80MT static weigh bridge system at main store and Bi-annual sta..
Universal Tooland Cutter Grinding Machine (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-110G (MMD-HPS) Work of inspection and preventive/breakdown maintenance of the CO2 flooding system of 4X75 MW HPS and for 2 X 2pt5 MW Mini Hydro Power Station at GSE..
Various Fly ash Spares
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Outstation 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5154G (MMD HPS - MiniHydro) - Work of Repairing/Refurbishment of Guide Vane Servomotor Cylinder of 2 x 2pt5 MW Mini Hydro Power Station, GSECL, Ukai, Gujarat; Guide..
Programmable Logic Controller Trainer Kit (Q3)
CCTV
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-94 Non Comprehensive Maintenance Contract for Servicing, Calibration, verification and stamping of 120MT capacity M/s Essae make Weigh in Motion Weighbri..
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Seminar; Job Fair; Buyer premise; Full day
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5184G Work Contract for routine, preventive & breakdown maintenance of instrumentation of instrument department of Unit no 3 to 6, Ukai TPS; WT-5184G Work Contract fo..
Construction of PHC Sub-Centre at Tarsadabar Village, Ta-Mandvi, Di-Surat, under CSR of Kakrapar Gujarat Site
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5170G Various maintenance works of Wagon Tippler 1 to 3 in coal handling plant at TPS UKAI on as and when required basis CHP 1 and 2; As per Schedule B and scope of w..
Single phase Flame proof Exhaust fan
GENERATOR AIR COOLER, MAKE: BHEL, DRG NO: 1-166-00- 40053, 90-10 CU-NICKLE FOR 75 MW UKAI HYDRO UNI
LED Luminaire For Floodlight Conforming To IS10322 (Part5/Section5) (V3) (Q2)
Construction of Library near Shree Gyandeep Vidhyalay at Unchamala under CSR of NPCIL (Kakrapar Gujarat Site).
Poly-palletsforbagstoragegodowns (V2) Conformingto IS13664 (Q3)
Corded AG-4 (100MM) small angle grinder of rated input power 900W, Corded AG-5 (125MM) small angle grinder of rated input power 1400W, Cordless (Battery operated) AG- 4 (100MM) small angle grinder of battery voltage 18V
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5187G (BMD-II) - Work of Ash lifting of ESP all 04 Pass for boiler unit 3, 4 and 5 during AOH/COH/R&M at Ukai TPS; As per Schedule B and scope of work mentioned in AT..
300mA X - Ray Machine (V2) (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5209G Biennial Work contract for maintenance of Ash Handling Plant Unit No 6 at Ukai TPS GSECL AHP-6; As per Schedule B and scope of work mentioned in ATC; As per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-95G (TMD-6) AMC of Voltas make chiller plant and other related auxiliaries of Air Conditioning System installed at 500MW Unit No-6 of Ukai TPS; As per Schedule B and ..
Facility Management Services - LumpSum Based - CHC; Health Equipment; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - CHC; Health Equipment; Consumables to be provided by service provider (inclusive in contract cost)
Industrial Safety Helmet (V3) ISImarkedto IS2925 (Q2)
Resurfacing of Vyara Kherwada Road, km. 0/0 to 17/69 (MDR), Ta. Vyara, District. Tapi (CRIF 2025-26)
Resurfacing of Songadh Waghnera road, km. 0/0 to 16/880 (MDR), Ta. Vyara, District. Tapi (CRIF 2025-26)
Stitching and Tailoring Service - Cutting + Stitching + Tailoring; As per specification atteched; Schools, Stitching and Tailoring Service - Cutting + Stitching + Tailoring; AS PER SEPCIFICATION; Schools
Cleaning, Sanitation and Disinfection Service - Outcome Based - Educational Institute; General Cleaning (Sweeping, Mopping, dusting); Indoor, dusting); Outdoor
ETAP LICENCE COMMERCIAL LAN 500 BUS, Certified Training at ETAP Training centre for two persons
W96414400025 STROBOSCOPE
Bushing Stuffing Box
Rotary Cam Operated Limit Switch, Balluff make Model no: BSW 819-494-03L3 Code: BSW0026.
LP-[ P] -2708_ Supply of Support bearing Runner plate for APH 31.5 VIMT 2000 of 500MW Unit No. 6 at Uka
Siemens make MCC panel spares
Digital Multimeter (Q3), Center Punch as per IS 7177 (Q3), Oil Can (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Supply of Tungsten Halogen Lamp compatible with UV-VIS Spectrophotometer Make: Shimadzu, Supply of Deuterium UV Lamp compatible with UV-VIS Spectrophotometer Make: Shimadzu