Loading…
Loading…
114 results • Latest
REPAIR TO SUNKEN SLAB, SOIL AND WASTE PIPE AND CONNECTED B/R WORK IN OTM AND MD ACCN AT WELLINGTON STATION UNDER GE WELLINGTON
REPAIRS/ REPLACEMENT OF MAIN DISTRIBUTION PIPE LINE AND CONTROL VALVES AND REPAIR OF WATER INSTALLATION INCLUDING SIGNAGE BOARD AT WELLINGTON STATION UNDER GE WELLINGTON
REPAIRS/ REPLACEMENT OF WATER SUPPLY PUMP, CONTROL VALVES AND CONNECTED ITEMS OF WELLINGTON STATION UNDER GE WELLINGTON
REPAIR/ REPLACEMENT OF MAIN FILTRATION PLANT AT UPPER GORKHA CAMP INCLUDING DISTRIBUTION PIPE LINES AND CONNECTED ITEMS AT WELLINGTON AREA UNDER GE WELLINGTON
REPAIR TO FENCING COMPOUND WALL INCLUDING FIRING RANGE AT WELLINGTON STATION UNDER GE WELLINGTON
REPAIRS TO ROADS AND ROAD FURNITURE UNDER AGE B R I AT GE DSSC WELLINGTON