Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
112 live68 closing this weekmost from PWD and Rural Development and Panchayat Raj Department
112 results • Latest
Special repairs to HT Installation and Servicing of 2 Nos 500 KVA Transformer and VCB at District Collectorate at Tirupathur in Tirupathur District.
Special Repair to EI and Renewal of fitting and fans arrangement in District Collectorate at Tirupathur in Tirupathur District.
Provision of Split AC Unit in 5 Nos Judge Champer, Server Room and CAO Chamber in Combined Court Building at Tirupathur in Tirupathur District
Provision of Split Ac in 3 Nos Judges Chamber and Server Room in Combined Court Building at Ambur in Tirupathur District.
Provision of Extending Additional 1 Floor of Existing 1No 26 person Bedcum Passenger Lift and Power main to District Integrated Public Health Laboratory over the First Floor of Existing 48 Bedded ward Building in District Head quarters Government Hos
Special Repair to UPS arrangement in District Collectorate at Tirupathur in Tirupathur District.
Special Repairs to Electrical Installation in primary Health Center at Venkatasamthiram in Tirupathur District
Special Repair to 160 KVA DG Set in Collector camp office in Tirupathur in Tirupathur District.
Renewal of Split Ac arrangement in Collector Camp Office at Tirupathur in Tirupathur district.
Restoration of Patches and potholes at Town Panchayat Area in Alangayam Town Panchayat
Providing New Borewell with Power Pump at Kambi Kollai Area for Miyawaki Forest in Ambur Municipality
Microscopes - Pathological and Research as per IS 4381, IS 5204, IS 4381, IS 5204 (Q3) 3 3
Providing Mini power Pump 2 Nos at Ward No.10 Barathidasan Street and Kailasagiri Road in Udayendiram Town Panchayat
Construction of Storm Water Drain with Cover Slab at Ward No.3 Gandhi Nagar in Udayendiram Town Panchayat
Construction of Storm Water Drain with Cover Slab at Ward No.10 Kailasagiri Salai in Udayendiram Town Panchayat
Tablet Computer (V2) (Q2)
Washing Machine-Domestic Purpose (Q2)
Entryand Mid Level Laptop-Notebook (Q2)
Special repairs to Leaky Roof Flooring Doors and Windows arrangements in Minnur PHC at Ambur in Tirupathur District
Special Repairs to Toilet Block G G 7 Pipe Line Water Supply and Sanitary arrangements in Collectorate Building in Tirupathur of Tirupathur District
Special Repairs to Toilet Block F G 7 Pipe Line Water Supply and Sanitary arrangements in Collectorate Building in Tirupathur of Tirupathur District
Special Repairs to Leaky Roof Painting Water Supply and Sanitary Arrangements in HSC Reddivalasai at Tirupathur Taluk of Tirupathur District
Special Repairs to Leaky Roof Painting and Water Supply Sanitary Arrangements in HSC Mallangkuppam at Vaniyambadi Taluk of Tirupathur District
Providing New Borewell with Mini power pump at Public Toilet in Govindapuram in Ward no 20 in Vaniyambadi Municipality
Providing New Borewell with Mini power pump at burial ground in Govindapuram in Ward no 20 in Vaniyambadi Municipality
Tirupathur District Village Panchayat General Fund - 2026-2027 - Construction of Recharge shaft at C.K.Asiramam in Kadhirimangalam Panchayat Tirupathur Block Package No.05
Tirupathur District Village Panchayat General Fund - 2026-2027 - Construction of Recharge shaft at Subamangalam in Poorigamanimitta Panchayat Tirupathur Block Package No.06
Thirupattur District - Providing New Borewell,Motor Pumpset and other Accessories with EB Service at Birapalli in Mittalam Panchayat at Madhanur Block Under 15th CFC(VP) -2025-26
Tirupathur District - Providing Paver block Road in Govidhapuram Habitation Ramar kovil Back side at Venkatasamuthiram Panchayat at Madhanur Block Under 15th CFC(VP)-2025-2026
Tirupathur District -Construction of Recharge Shaft at Mariyamman Kovil Street in Vadakarai Panchayat at Madhanur Under Panchayat Union General Fund-2026-27
Tirupathur District -Construction of Recharge Shaft at Venkatasamuthiram Eri in Veerankuppam Panchayat at Madhanur Under Panchayat Union General Fund-2026-27
Tirupathur District - Construction of Recharge Shaft at Kundan Vattam in Melkuppam Panchayat at Madhanur Under Panchayat Union General Fund-2026-27
Tirupathur District - Construction of Recharge Shaft at Akathikalmugam in Chinnapallikuppam Panchayat at Madhanur Under Panchayat Union General Fund-2026-27
Tirupathur District - Construction of Recharge Shaft at Kandan Vattam in Melkuppam Panchayat Uat Madhanur Under Panchayat Union General Fund-2026-27
Tirupathur District -Construction of Recharge Shaft at Malaiyambut Eri in Malaiyambut Panchayatat Madhanur Under Panchayat Union General Fund-2026-27
Providing water Supply Improvements to existing system laying of DI Pipeline from Malatar River to Ambur Collection tank with pumping system head work serves ward no 1 2 3 4 5 and Additional supply to Kaspa A 4 lakh OHT and Kaspa B 3 Lakh OHT tank i
Special Repairs to Doors windows Cupboard in all floors and sanitary arrangements in MCOP Judge chamber and Public Toilet in Combined Court Building of Thirupathur at Thirupathur District
Providing Borewell arrangements to the Agricultural Engineering Extension Centre AEE Campus at Tirupathur in Tirupathur Distrcit
Annual Maintenance and Repair Works for the year 2026 27 to Mini power pump from 19 to 36 ward in Vaniyambadi Municipality
Annual Maintenance and Repair Works for the year 2026 27 to Mini power pump from 1 to 18 ward in Vaniyambadi Municipality
Attending Water Supply Pipeline Burst work from 19 to 36 ward in Vaniyambadi Municipality
Attending Water Supply Pipeline Burst work from 1 to 18 ward in Vaniyambadi Municipality
MANUFACTURE, FABRICATION, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF ENHANCEMENT OF POWER TRANSFORMER CAPACITY FROM 1X8 IN TO 2X8 MVA AT 33/11KV SUBSTATION SINGARAPET IN THIRUPATTUR EDC IN VELLORE REGION WITH ASSOCIATED EQUIPMENTS, ACCESSORI
Monthly Basis Cab & Taxi Hiring Services - SUV; 2600 km x 364 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2600km x 364 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2600km x 364hours; Outstation 24*7
Construction Recharges Shaft at Chettery Dam in Velakalnatham Panchayat Package 09
Construction Recharges Shaft at Adiyathuran Vattam in Puthagaram Panchayat Package 08
Construction Recharges Shaft at Paniyandapalli in Paniyandapalli Panchayat Package 07
Construction Recharges Shaft at Mallapalli in Mallapalli Panchayat Package 06
Construction Recharges Shaft at Kalnarsampatti in Kalnarsampatti Panchayat Package 05