Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,328 results • Latest
Replacement of Split ACs and RO water Coolers at Tirupati Airport
Construction of Vertical Extension 3rd Floor over the Existing Simhachala Hostel G plus 2 floors including water supply, Sanitary installations drainage compound wall and IEI and fans power wiring street lighting panel fire fighting with down corner system manual fire alarm system CCTV surveillance system for National Sanskrit University at Tirupati Andhra Pradesh SH providing inspection vehicle for the Office of Assistant Engineer CPWD Tirupati on hire basis for Nine Months Subwork/Packages: Providing inspection vehicle for the Office of the Assistant Engineer CPWD Tirupati on hire basis for Nine Months
Periodical Painting of External surfaces of Type-II/III/IV/VII/VIII Qtrs at PHC-I and II, SDSC SHAR.
External Painting of Residential Quarters B4/C/C2/D/D2/E/E7 at SMN Housing Colony Sullurpeta.
Manpower Outsourcing Services - Fixed Remuneration - Finance/Accounts; Accountant; Graduate
Wheeled Fire Extinguishers (V3) ISI Marked to Is 16018 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Construction of Phase-B Permanent Campus for Indian Institute of Technology Tirupati, at Merlapaka village, Yerpedu Mandal, Tirupati Dist., A.P. Sub Head: Upgration works for existing SCADA System by providing DI, DO, Relays, Hard wiring etc., for the existing RTU Panels and configuration.
Projector
"Stripping, Re-cushioning and Fitment of Seats and Berths of LHB coaches at Carriage Repair Shop, Tirupati.
Portable Fire Extinguishers (V3) ISI Marked to IS 15683 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Single Row Deep Groove Ball Bearing (Without Flange Outer Ring) asper IS6455 (Q3)
Trisodium Phosphateasper IS573 (Q3)
Allin One PC (V2) (Q2)
Plastic Stool (V2) (Q3)
Notice Inviting Tender for the supply, instatllation, testing, commissioning and training of Freeze dryer
LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2)
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 5 Bid Number : GEM/2025/B/6990980 Dated : 15-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Accounts Officer Finance & Accounts Division (P), SATHISH DHAWAN SPACE CENTRE SHAR, SRIHARIKOTA-524124 (Accounts Officer)
Supply of Aluminium Oxide
Supply of 1-4 Butane Diol (BDO)
Supply of Tri Methylol Propane (TMP)
Supply of Phenyl Beta Napthyl Amine
Industrial Platform Truck (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6718189 Dated : 06-10-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACCOUNTS OFFICER, SDSC SHAR Finance and Accounts Division, Administrative Building, Satish Dhawan Space Centre SHAR, Sriharikota - 524124 (Accounts Officer, Sdsc Shar)
Supply of Castor Oil
Supply of Ferric Oxide
Supply of Benzene
Supply of Epoxy
Supply of Ferric Acetyl Acetonate (FEAA)
Blanketfor AC Coach Passengers (V2) Indian Railways (Q2)
Construction of Deep Ocean Mission Vertical Microbial Repository and Laboratory facilities for NIOT National Institute of Ocean Technology at Chittedu Tirupati AP. SH Arranging Manpower services to the office of Assistant Engineer CPWD Krishnapatnam Nellore for 09 Months Subwork/Packages: Arranging manpower services to the office of the Assistant Engineer CPWD Krishnapatnam nellore 09 months
Watch and Ward Security Contract of Deployment of 04 Nos of Supervisors(unarmed) at Tirupati Airport
night vision device - night vision equipment (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7081857 Dated : 07-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 38 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr. Accounts Officer Satish Dhawan Space Centre SHAR, Department of Space, Indian Space Research Organization, Department of Space (Sr. Accounts Officer, Sdsc Shar)
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Level Transmitter Radar Type (Q3) ( PAC Only ) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Siliconesealant (Q3)
Custom Bid for Services - Fiber Optics cable repair work Similar Category Repair and Overhauling Service
DIGITALSIGNALPROCESSING BOARD (Q3)
Proposed BT for approach road DBM, SDBC layer connecting to service building and providing MS grill fencing from Toll Plaza on either side to compound wall at Visitors complex, SDSC SHAR.
Stainless Steel Threaded Fastenersasper IS1367 (Part14) (Q3)
Plain Washerasper IS2016 (Q4)
Handloom Cotton Pillow Covers (V3) (Q2)
Manpower Outsourcing Services - Minimum wage - Semi- skilled; 0; Others
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; Healthcare; Staff Nurses
Transinstallation of ALCMS and other misc. works for NATS Building at Tirupati Airport
Commercial Idli Steamer (Q3)
Household Refrigerating Appliancesasper IS17550 (Q2)
Sofa Set or Couch (Handicraft) (V2) (Q3), Table (Handicraft) (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Toilet Soap, Liquid (V3) Conforming to IS 4199 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
ARMO Annual Repair and Maintenance Operations of Civil Works for ESI Hospital, Tirupati, ESI Diagnostic centre and ESI Dispensary at Adoni west during 2026-27
HRC (High Rupturing Capacity) Fuse Conformingto IS/IEC60269 (Part2) (Q3)