Loading…
Loading…
1,046 results • Latest
Providing Consultancy services for conducting topographical survey and preparation of DPR for the work Scheme to Lift water from Kunigal Doddakere to fill 39 tanks in Kasaba & Huliyurdurga hobli in Kunigal taluk for drinking water purpose including conducting necessary survey, preparation of LS CS Alignment/Layout Plans Design of structural components Electro-mechanical components and pipeline network after conducting necessary soil investigations and preparations of detailed project report consisting of detailed estimates designs survey maps and Bid documents as per relevant Indian standard codes and applicable rules including cost of Men, Equipment, Vehicles, Plotting/Printing & supply of DPR Design & drawings of Required Numbers of copies in required size till final approval of the DPR designs and Drawing from the competent authority of the Department. complete as per the directions of Engeer-in-Charge.
DEGASSING AND DEPRESSURING FACILITY
LPG self closing valve refurbishment
Providing Manpower on outsource basis to CDPO Offices across Tumkur District
Construction of road and drain at 1st cross Bhovipalya,SLN Layout and national school beside vivekananda nagara antrasanahalli in ward no 2,Under Tumkuru City Corporation town limits.
Supply of labour and Tractor for the immersion of Ganesha idols in Ward no. 71-Nelemaheshwaramma, 72-Dasarahalli, of Dasarahalli sub divison in Dasarahalli Divisoin
Supply of labour and Tractor for the immersion of Ganesha idols in Ward no. 68-Mallasandra, 69-Bagalagunte, 70-Manjunatha Nagara of Bagalaguntee sub divison in Dasarahalli Divisoin
Supply of labour and Tipper/Tractor for the immersion of Ganesha idols in Ward no. 60-Jalahalli, 61-Brundavana, 62-HMT, 63-J P Park 64- Yashwantha Pura, of (old Yeshwantha Pura Sub division)
Supply of labour and Tractor for the immersion of Ganesha idols in Ward no. 65-Abiigere, 66-Kammagondanahalli, 67-Shettyhalli, of Shettyhalli sub divison in Dasarahalli Divisoin
Preparation, Arrangements & maintenance of Kalyani for Ganesha idol immersion at J P Park Kalyani (ward no-63) for the year 2026-27 in Ward No 63
Providing FHTCs to 57 Households in Menigharahatti Habitation of Yaradhakatte Village Kurubarahalli Grampachayth of Sira taluk by Augmentation and Retrofitting through SVS in Sira taluk Tumkur district
Construction of CC Road From Bhimaraju house to Mariyappa House in Bodabandenahalli Village,Kasaba Hobli Koratagere Taluk
Supply of Trycycle Bike for Specially Disabled Persons in Sira CMC Limits
Supply of Telemedicine items for Urban Health and wellness center
Raising of Seedlings in 14x20 Size-2000 Pbs at Sopanahalli Nursery in SF Range Gubbi during 2026-27
CHECK TEMPLATE AND DRILL TEMPLATE FOR LUH
Drilling of borewell and installation of pump and motar in ward no 13kote area and installation of cable pipeline to already drilled borewells in ward no 26,19,31 and 23 and installation of valves near kanaka statue and gouligarahatti ward no 20 and near ZP tank in ward no 31 and near nandini water and repair of motar and jackwell at pump house in sira cmc limits
Safety Footwear (V3) ISImarkedto IS15298 (Part2) (Q2)
Maintenance of 2021 Rains AVADA Solar Park to Main Sub Station (AP Border) Roadside Plantation in SF Range Pavagada during 2026-27-4.0Km-
Maintenance of 2021 Rains Valluru Cross to Kyataganacherlu Village Roadside Plantation in SF Range Pavagada during 2026-27-4.0Km
Maintenance of 2021 Rains Valluru Cross to AVADA Solar Park Roadside Plantation in SF Range Pavagada during 2026-27-4.0Km
Maintenance of 2021 Rains Thirumani Circle to Valluru Cross Roadside Plantation in SF Range Pavagada during 2026-27-5.0Km
Annual maintenance of Road SH 03 Koratagere To AP Border via Vaddagere , Kodagadala,(NH 234), Purava ID Halli Joinig AP Border(SH 160) from Ch 13.50 To 21.720, and 21.85 To 42.17 Km in Madhugiri taluk for the year 2026-27(Total Lenght 28.67km- 13.50 to 42.17 km)
Annual Maintenance to road from Sira to AP Border Via PN halli Gate, Amarapura, Arasikere, Pavagada, Veerupasamudra From Ch 54.62 to 59.34, 63.25 to 80.70 and 121.00 to 122.04 Km in Sira Taluk For The Year 2026-27
Maintenance of Two Year Old 16.00 Ha C.A Plantation at Ranganathapura S.F (Maragondanahalli Sy No 31) in Sira Range
Annual maintenance of Road connecting Bagepalli to Halaguru (SH-94) From Ch 79.570 to 95.79km and Ch 101.10 to 102.59km for the year 2026-27 in Koratagere Taluk.
Annual Maintenance of Road Tarikere to Dharmapura Via Hosadurga, V V Pura, Hiriyuru From Ch 137.72 to 140.37 km in Sira taluk for the year 2026-27
Annual Maintenance of Road Kyadigunte to AP Border Via Yadaladaku, Kurabaraanahalli From Ch 0.00 to 5.70 And 7.40 to 9.00 km in Sira taluk for the year 2026-27
Annual maintenance of Road Thotadamadagu,Hanumantapura, Chathrapalya, Nagalapura,S.Appenahalli, Yammethimmanahalli,Shravanagudi,Bedattur, Nallekamanahalli, Benakanahalli, attiganahalli,R.Gollarahatti,R.Gollahalli,G.D.Palya joining Andra border from Ch.0.00 to 1.40, 3.49 to 3.60, 3.80 to 9.0, 12.80 to 15.50, 16.04 to 17.75Km in Madhugiri taluk for the year 2026-27 (Total length 16.81Km,0.00 to 17.75Km Overlap length 1.65Km)
Annual Maintenance to Road from Garani To AP Border via Hosakote,Neerakallu, Chinnenahalli, Kattirajanahalli,Brahmadevarahalli, Kasapura, Mallanayakanahalli,M Gollarahatti CH 0.00 To 1.00 KM, 2.40 to 3.40, 10.00 to 12.25, 13.70 to 17.00 & 23.63 To 26.24 km In Madhugiri taluk for the year 2026-27 (Total length 26.24Km (Overlap length 0.71Km))
Annual maintenance of to Road from Doddaveeraganahalli (on NH69) Sidadaragallu CH 0.00 to 5.00 KM In Madhugiri Taluk for the year 2026-27
Anuual Maintenance of road Shambonahalli gate to Bandrehalli via Shambonahalli, Ganjalagunte, Maravekere Ch 0.00 to 1.80 km in Madhugiri taluk for the year 2026-27
Anuual Maintenance of road NH-234 To Nitrahalli, Handralu, Tagihalli, Sankapura, Immadagondanahalli, Veernagenahalli, Kalenahalli, Hosahalli, Reddyhalli, Kodigenahalli Road From CH 0.00 To 2.60, 5.85 To 9.13 Km, 10.35 To 21.14 KM In Madhugiri Taluk for the year 2026-27
Anuual Maintenance of to Doddayalkuru, Dadagondanahalli, Tippapura, Adavinagenahalli, Singanahalli, Tireyuru, Kadagathuru, Joining Andra Boder Road from CH 0.00 to 0.75 , 4.75 to 6.65, 8.66 To 9.90, 13.85 to 14.80 and 15.30 to 16.00 KM In Madhugiri Taluk for the year 2026-27
Annual maintenance of Road Bedattur s Appenahalli from Ch 0.00 to 4.93Km connecting SH-3 IN Madhugiri taluk for the year 2026-27
Annual Maintenance of Road from NH-4 via Urukere,Tovinakere,dabbeghatta,Rantavalalu joining A.P Border from Ch.21.64 to 21.75Km, 23.45 to 23.60 Km 28.00 to 29.00 km 30.00 to 39.60 and 40.65 to 42.00 Km in Madhugiri taluk for the year 2026-27(Total Lenght 22.80km- 20.84 to 43.64km)
Anuual Maintenance of to ID Halli to Andra border via janakaloti, hosaetakaloti oblapura checkadalvatta, vitlapura Road from CH 0.00 to 4.00 , 4.40 to 9.70, 11.45 to 15.20 KM, In Madhugiri Taluk for the year 2026-27
Annual Maintenance to road from Sira to Nanjanagudu Via Gubbi, Kalluru, Yadiyuru, Amruthuru, Mandya, Hosahatti, T Narasipura From Ch 0.00 to 11.00 Km in Sira Taluk (SH-84) For The Year 2026-27
Anuual Maintenance of Chinakavajra to Chandrayanadurga ch 0.00 to 3.00 km in In Madhugiri Taluk for the year 2026-27
Anuual Maintenance of Siddapura gate to Neralekere via maritimmanhalli, Veerapura 0.00 to 1.00, 2.70 To 6.10 Km , in Madhugiri Taluk for the year 2026-27
Annual maintenance of Road Midigeshi to Reddihalli joining Andra Border from CH 0.00 To 4.55, 5.00 to 7.30 KM in madhugiri taluk for the year 2026-27
Annual Maintenance of Hanumanahalli- Bommarasanahalli Road from 3.30 to 7.44, 7.51 to 7.70, 10.0 to 14.20 15.65 to 16.00, and 16.30 to 16.65 KM In Madhugiri Taluk for the year 2026-27 (Overlap Length 0.12Km)
Annual Maintenance ofKodigenahalli-muddenahalli Road from Ch 0.00 to 2.85, 3.10 to 3.60, 4.10 to 4.40 8.91 to 9.195 9.77 to 10.00 and 10.20 to 10.59 KM in Madhugiri taluk For the year 2026-27
Anuual Maintenance of NH-234 To Naviladaku, Chanagiripalya, Kulumenahalli, Hunnasavadi, Pujarahalli, kondavadi, Kamsanahalli, Ranganahalli, Jogihalli, Doddamaluru, Road Ch 0.00 To 5.30 7.80 To 8.36, 9.30 to 9.85 KM and 12.50 to 15.60 km In Madhugiri Taluk for the year 2026-27
Anuual Maintenance of NH-48 to SH-158 Via Koratagere Bhairenahalli Road from CH 43.77 To 54.54 KM In Madhugiri Taluk for the year 2026-27
Annual maintenace of to NH 234 to Bislahalli via Shetty halli byalya, Handralu, kondavadi, Gandigrama road from ch 0.00 to 5.00, 7.00 to 11.31 and 11.70 to 12.40 KM IN madhugiri Taluk for the year 2026-27
Anuual Maintenance of to NH 234 To Connecting Kurudi via Vadrahatti Chikkahosahalli hanumathapura hunasavadi Road from CH 3.00 to 3.75 KM, 3.77 to 5.11 KM, 5.25 To 6.82 KM, 7.05 To 8.52 And 9.52 TO 11.20 Km In Madhugiri Taluk for the year 2026-27
ANNUAL MAINTANCE OF THE ROAD FROM HOSKERE HUILDORE ROAD TO THOVINAKERE DABBEGHATTA ROAD VIA HALADODDERI FROM CH-15.00-24.00KM IN SIRA TALUK FOR THE YEAR 2026-27(Total length 16.00 km from CH 15.00-16.00km)
Annual Maintenance of Road Hariyajjihalli to Harogere Via Gonihalli From Ch 0.00 to 3.50, 8.50 to 12.63 and 13.00 to 14.00 km in Sira taluk for the year 2026-27
Annual Maintenance of Road Tavarekere to Bevinahalli From Ch 0.00 to 3.00, 6.00 to 12.00 and 14.00 to 17.50 km in Sira taluk for the year 2026-27