Loading…
Loading…
2,835 results • Recent activity
ECHP-I- Strengthening of damaged base concrete of cable tray support structure and also providing additional support from Transfer pile structure to the cable tray from 95 mtr. To 195 mtr. at Conveyor-16
Strengthening and Raising the North side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 300m to CH 450m from hump towards spillway
Supply of 3 Phase 415V 110KW Draw out Type LT Module
Strengthening and Raising the West side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 150m to CH 300m from hump towards spillway
ECHP-II Complete overhauling of 8 Ton, 5 Ton and 2 Ton capacity electrical hoist with trolley including dismantling and re-erection at TT-7 Top floor, Conveyor 61 tail end, Conveyor 61 head end, drive house floor of Conveyor-61, Conveyor-73 head
Strengthening and Raising the West side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 0m to CH 150m from hump towards spillway