Loading…
Loading…
2,842 results • Recent activity
ECHP-I-Attending Secondary Crusher shift duty operation and allied work in 3 shifts such as inspection and operating the 3 Nos. Secondary coal crusher A,B,C, 3 Nos. in Secondary Crusher House-I
ECHP-I- Operation of electromagnet CBMS in Conveyor-17 head end and removal metal pieces picked by the magnet under works contract
ECHP-I- Operation of electomagnet in Conveyor-43 head end ILMS and removal of metal pieces picked up the magnet under works contract
ECHP-I- Attending preventive maintenance works like cleaning, terminal tightness checking, greasing and meggering of HT/LT conveyor drive motors.
ECHP-I- Attending to preventive and breakdown maintenance of electrically operated 10 Nos. Hoist in SCH-I, PCH-I and Conveyor-17 tail end.
ECHP-I-Attending breakdown and preventive maintenance works such as replacement of wornout conveyor belt, gear coupling etc in belt feeder, shuttle feeder RBFD 20,21,BFD 22,23 SFD 4A,4B,5A,5B and 5C at SCH-I